BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 30, 2025 at 7:00 PM

Updated February 1, 2025

Site work, outdoor lighting and new construction of a mixed-use development in Fargo, North Dakota. Completed plans call for the construction of a 8,000-square-foot, one-story above grade playground / park / athletic field; for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and swimming pool.

Bid Packages of Construction Work. The Owner has contracted with a Quality Control / Special Inspections Contractor. In redesigning Romkey Park, it will receive new landscaping and lighting improvements throughout. Sitework will include a skatepark, pickleball courts, playgrounds, sledding hill, and various other park amenities. This project will replace the existing 50-meter pool with a new 25-meter pool and provide a new zero depth pool and splash pad. A new pool building will replace the existing building and include the pools mechanical systems, fixtures, lifeguard training area, first aid, offices, storage, reception, and concessions along with other similar spaces. The scope includes the new construction of a single story, roughly 8,000 SF pool house masonry walls, brick face, metal siding. Locker room, staff area, community room and mechanical area for pool and a 6 lane, 25 yard pool with water slide diving board climbing wall. Splash pad, skatepark, playground, natural playground. BID PACKAGES (See 01 12 00 Multiple Contract Summary for more information): 4 Masonry 5B Metal Fabrications 6B Wood Trusses 7A Asphalt Shingles 7B Metal Siding 7C Caulking & Sealants 7D Building Insulation 7E Spray Applied Vapor Barrier 8A Doors, Frames, Hardware 8B Aluminum Openings and Glazing 8C Coiling Doors 9A Resilient Flooring & Carpeting 9D Painting & Coatings 9E Epoxy Concrete FloorinG 10A Lockers 13 Pool Construction 22/23 HVAC/ Plumbing 26 Electrical 31 Site Civil 32A Pavement Markings 32B Concrete Paving 32C Site Fencing 32D Playground Equipment/ Site Furnishings 32E Landscaping 33 Site Utilities Questions Shall Be Directed to the CMAR . The Architect Assumes No Responsibility for Receiving and Delivering Contractor Bids to the Bid Opening. All Bids Shall Be in Accordance With Bidding Documents Prepared by Yhr Partners, Ltd., 420 Main Avenue, Moorhead, MN 56560. The Owner and CMAR Reserves the Right to Reject Any or All Bids and Waive Informalities Therein.

Occupancy

Playgrounds / Parks / Athletic Fields

$9,500,000.00

Public - City

New Construction, Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

55

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
22
Bidding Soon
316
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 5, 2024

December 9, 2024

Project location map

800 19th St S, Fargo, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.