BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a development in Poseyville, Indiana. Completed plans call for site work for a development.

North Posey 2024 Bond Projects Location 5900 High School Rd, Poseyville, Indiana 47633 Document info : Amount of the deposit for up to three sets of bidding documents may be refunded in full when the Plans and Specifications have been returned to MACO - Evansville Blue within ten (10) days after time set for receiving bids and in good re-usable condition. If the Plans and Specifications are returned after this ten (10) day period or in unusable condition, the deposit will be forfeited. Proposals for the work as indicated on the contract documents will be received as follows: Unified Bid Package: Base Bid shall include general, architectural, structural, civil, mechanical, plumbing, and electrical construction. A bid may not be withdrawn for a period of sixty (60) days following the time and date designated for the receipt of bids. Subcontractor and Materials List: The bidder shall include with the Proposal Form the subcontractors and major material suppliers which the bidder will be using on the project. Once submitted, the bidder may not change a proposed subcontractor without Owner approval. Bidders should submit the Subcontractor/Material Supplier List to the Architect Bid Security - A Bid Bond of 5% is required. Contractor shall include performance, labor, and payment bonds. Owner reserves the right to reject any and all bids and waive any and all informalities, whether or not the Bids comply with the prescribed requirements, and alternates and unit prices if requested in the Bid Forms. It may consider the qualifications and experience of Subcontractors and other persons and organizations (including those who are to furnish the principal items of material or equipment) proposed for those portions of the work for which the identity of Subcontractors and other persons and organizations must be submitted as specified in the "Information for Bidders". It may conduct such investigations as it deems necessary to establish the responsibility, qualifications and final ability of the bidders, proposed Subcontractors and other persons and organizations to do the work in accordance with the Contract Documents to Owner's satisfaction within the prescribed time. Owner reserves the right to reject the Bid of any Bidder who does not pass any such evaluation to Owner's satisfaction. Each bidder shall visit the site of the proposed work and become fully acquainted with conditions as they exist so the Bidder may fully understand the facilities, difficulties, and restrictions related to the execution of the work under contract. Bidder shall also thoroughly examine and be familiar with the Drawings and Project Manual. Failure or omission of any Bidder to receive or examine any form, instrument or document or to visit the site and to become acquainted with existing conditions shall in no way relieve the Bidder from any obligation with respect to the Bidder's Bid Proposal. The Architect shall not be responsible for oral, telephonic instructions or any other verbal explanations or interpretations of the Construction Documents. Every request for such interpretation shall be made in writing and addressed and forwarded to Jennifer Kissel, AIA, Hafer, 21 SE Third Street, Suite 800, Evansville, IN 47708 or jkissel@haferdesign.com. Every interpretation made to a Bidder shall be in the form of an Addendum to the Contract Documents which, if issued, shall be sent as promptly as is practical to all persons to whom Contract documents have been issued. All such Addenda shall become part of the Contract Documents and must be acknowledged on the Bid Proposal Form as having been received and included as part of the Bid Proposal.

Post-Bid

Conservation and Development

$1,000,000.00

Public - County

Site Work

92

27

24

6

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
20
Bidding Soon
383
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 9, 2024

January 8, 2025

img_map_placeholder

5900 High School Rd, Poseyville, IN

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.