BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 19, 2024 at 7:00 PM

Updated November 20, 2024

Site work and paving for a mixed-use development in Bellevue, Washington. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Consultants will be considered for the Eastrail – Mountains to Sound Greenway Regional Trails Connection project. Project Description The work to be performed by the Consultant consists of preparing preliminary engineering design, and developing 30%, 60%, 90%, 100%, and bid ready design plans, specifications, and estimates (PS&E) for the project. The proposed improvements include the construction of a multi-use path on the west side of 118th Ave SE between I-90 and SE 32nd St, and providing a new at-grade walkway on the south side of SE 32nd St between 118th Ave SE and Eastrail. The major features of the project are as follows: Construct a multi-use pathway along with associated retaining wall, planter strip with irrigation, curb, and gutter Resurface and restripe all roadway within the project limits Install a new RRFB crossing at the intersection of 118th Ave SE and SE 32nd St Construct new curb ramps and marked crosswalk at the south leg of the intersection of 118th Ave SE and SE 32nd St Construct a new at-grade walkway on the southern shoulder of SE 32nd St Other improvements and work associated with the project include, but are not limited to, site preparation, erosion and sediment control, storm drainage system, flow control and water quality facilities (if needed), environmentally sensitive area impact mitigation, franchise utilities relocation (if needed), irrigation, landscaping, channelization, retaining walls, illumination, intelligent transportation systems, signing, traffic control, and other mitigation as required. See Attachment “A” of the full RFQ document available on the Shared Procurement Portal for more detailed Scope of Work information This agreement is anticipated to begin in January 2025 and will be for approximately 15 months in duration. The City reserves the right to retain the services of the successful firm(s) for any subsequent phases [right of way (R/W), construction (CN)] associated with this project. Any questions regarding this project should be directed to Quinn Floyd, at qfloyd@bellevuewa.gov The method of Contractor Selection has not been Determined at this time.

Conceptual

Roads / Highways

$100,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
0
Bidding Soon
1,029
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 1, 2025

Project location map

Mountains to Sound Greenway, Bellevue, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.