BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Concrete, Washington. Conceptual plans call for site work for a bridge / tunnel.

This caused high velocity flows in South Osterman Creek to erode the soils under the existing 60-inch concrete culvert, leading a portion of the culvert to fail and fall into the creek. South Osterman Creek is located at approximately MP 13.2 on the Concrete Sauk Valley Road. Design of the culvert repair has been completed, permitted, and approved for construction. The work to be performed by the selected Consultant may include but is not limited to; update final bid specifications to 2025standards, update final estimate of construction costs, pre-bid support and construction services such as: submittal reviews, RFIs, change orders, onsite inspection, construction documentation, contract close out support, and other construction-related tasks. Consultants are alerted that this is a FEMA funded project. This project currently has a mandatory Disadvantaged Business Enterprise (DBE) goal of zero percent (0%); however, Skag it County encourages all perspective Consultants to utilize DBE firms. Begin work with Consultant January 2025 Advertise for Contractor Bid February 13th, 2025 Complete work / End contract Late Fall 2025 Skag it County in accordance with Section 504of the Rehabilitation Act(Section 504) and the Americans with Disabilities Act (ADA), commits ton on discrimination on the basis of disability, in all of its programs and activities. This material can be made available in an alternate format by emailing Devin Willard at dwillard@co.skagit.wa.us or calling(360) 416-1400. Skag it County reserves the right to amend terms of this "Request for Qualifications" (RFQ) to circulate various addenda, or to with draw the RFQ at anytime Question Deadline 11/18/2024 at 4:00 PM PT Any questions regarding this project shall be directed in writing to Thomas Weller at tweller@co.skagit.wa.us Answers Posted November 19th, 2024 @ 4:00 p.m The method of Contractor Selection has not been Determined at this time.

Conceptual

Bridges / Tunnels

$80,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
41
Bidding Soon
1,790
All Active Projects
729
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.