BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 3, 2025 at 7:00 PM

Updated May 10, 2025

Renovation of a power facility in Alexandria, Minnesota. Completed plans call for the renovation of a power facility.

The general nature of the work on which proposals will be received consists of the following: Construction of mainline and residential underground electric distribution lines including primary, secondary, and service circuitry; and the installation of conduit, cables, box pads, and other related equipment and material. Payment to the Contractor will be made on the basis of ninety-five percent (95%) upon certification of work completed; five percent (5%) thirty-one (31) days after final completion and acceptance. The construction may be started after the execution of the Construction Agreement and delivery of a Notice to Proceed issuance. All bids shall be made on bid forms furnished by the Engineer and shall be accompanied by bid security in the form of a certified check or bid bond, made payable to Alexandria Light and Power, Alexandria, Minnesota, in the amount of ten percent (10%) of the bid, which security becomes the property of Alexandria Light and Power in the event the successful bidder fails to enter into a contract and post satisfactory performance and payment bonds. Alexandria Light and Power reserves the right to defer acceptance of any proposal for a period not to exceed thirty (30) days after the date proposals are received and no proposal may be withdrawn during this period. Alexandria Light and Power also reserves the right to reject any or all bids and enter into such contract as it shall deem to be in the best interest of Alexandria Light and Power. The project shall be substantially completed by November 15, 2025. Document Note: Complete digital project bidding documents are available at online. You may download the digital plan documents for $22. Est. Value: $ 890,000.00 Est. Value Notes: $890,000 Est. Completion Date: Nov. 15, 2025

Bid Results

Power Plant

$742,066.00

Public - City

Renovation

122

13

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
23
Bidding Soon
443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

January 10, 2025

Project location map

Multiple Locations, Alexandria, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.