BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 29, 2025 at 7:00 PM

Updated January 30, 2025

This is a service / maintenance or supply contract in Derry, New Hampshire. Contact the soliciting agency for additional information.

The Town of Derry, Department of Public Works, Building and Grounds Division is seeking proposals from architectural firms and engineering firms for the preparation of a Town Facility Master Plan for three Fire Stations owned by the Town of Derry as well as the Taylor Library located at 49 East Derry Rd. The Master Plan must take into consideration the following major components of the subject facilities: - Structural integrity of the building from foundation and sills up to and including the roof. - Exterior of the building including painting needs, siding, brick work, etc... - Interior conditions of finishes including floors, walls, ceilings and all interior components such as doors, permanent partitions, moulding, etc. - Mechanical systems with consideration of lifespan of major components such as boilers, air conditioning systems, and plymovents. - Electrical systems with consideration of present electrical codes and service capacity. - Fire protection systems. - Environmental concerns such as lead paint and asbestos. - Energy efficiency of structures including insulation, thermo-pane windows, and modern lighting. - Compliance to the American Disabilities Act in all aspects of the building. The proposal will require a general overview of all facilities with a plan for renovation and continued upkeep of these facilities along with rough cost estimates for the improvements. While it will be necessary to make an assessment on each building, this is not intended to be a document to be used for letting contracts for construction. The purpose of this proposal is to prepare a long range plan for the upkeep of Town owned facilities and to plan for needs of these facilities in the Capital Improvement Plan of the Town of Derry for a fifteen year period. For budgeting purposes, the cost associated with the library should be separated from the remaining three fire stations. The following facilities will be included: Station 2 190 Warner Hill Rd Station 3 1 English Range Rd Station 4 74 Hampstead Rd Taylor Library 49 East Derry Rd The plan must be completed by March 31, 2025. Inquiries should be addressed to Alan R. Cote, Supt. of Operations, Derry Municipal Center, 14 Manning Street, Derry, NH, Phone # (603) 432-6144. The Town of Derry reserves the right to reject any or all proposals.

Conceptual

Fire / Police

Public - City

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
491
Active Projects
223
Bidding Soon
3,902
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 15, 2025

Project location map

Multiple Locations, Derry, NH


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.