Published June 11, 2025 at 8:00 PM
Updated June 12, 2025
Site work, paving and renovation of a mixed-use development in Charleston, South Carolina. Completed plans call for the renovation of a transportation facility; for site work for a transportation facility; and for paving for a transportation facility.
The purpose of Amendment 3 is to add one attchment - "Site Visit Attendees Contact Info" and remove "Site Visit Attendees." As of February 18, 2025, project is in GC bidding. The contractor shall provide the labor, equipment, materials, and supervision necessary to complete project number DKFX 1052062 Repair Maintenance Dock B578 and Repair IMC Pavements Area F at Joint Base Charleston, South Carolina. Project Location: Joint Base Charleston, South Carolina Project Title: Repair Maintenance Dock B578 and Repair IMC Pavements Area F Project Location: Joint Base Charleston, South Carolina THIS SOLICITATION IS ISSUED AS A COMPETITIVE HUBZone BUSINESS SET-ASIDE USING TRADE-OFF PROCEDURES AND THE PROVISIONS OF SECTIONS L & M. NOTICE TO OFFEROR(S)/SUPPLIER(S): FUNDS ARE NOT PRESENTLY AVAILABLE FOR THIS EFFORT. NO AWARD WILL BE MADE UNDER THIS SOLICITATION UNTIL FUNDS ARE AVAILABLE. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION, EITHER BEFORE OR AFTER THE CLOSING DATE. IN THE EVENT THE GOVERNMENT CANCELS THIS SOLICITATION, THE GOVERNMENT HAS NO OBLIGATION TO REIMBURSE AN OFFEROR FOR ANY COSTS. Project Magnitude: Between $5,000,000 and $10,000,000. The Notice to Proceed will be issued within 45 days of award. NAICS Code: 236220 Size Standard: $45,000,000 Please forward any questions or concerns to: megan.rowlett@us.af.mil The deadline for all questions pertaining to this solicitation will be 27 Feb 2025 at 12:00 PM EST. Remarks and explanations provided at the conference shall NOT qualify the terms of the solicitation and statement of work. Unless the solicitation is amended in writing, it will remain unchanged. Should an amendment be issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply. The contractor shall begin performance within 10 calendar days and complete it within 398 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. This project is to repair a +/- 27,100 SF aircraft maintenance dock building to include replace air handler unit, chilled water supply/return pumps. Replace chiller and packaged terminal A/C units. Replace domestic hot water heater. Replace faulty 400 HZ wiring and converter. Repaint hangar floor, and CMU walls, update bathrooms and fixtures, update office floor and fixtures. Assess and repair, as necessary, the existing fire suppression system to comply with TAB 1 Sundown Policy Foam Fire Suppression System. This project also includes the replacement of existing asphalt and concrete pavements with a new concrete pavement section, new pavement markings, and incidental work. The anticipated performance time is 398 calendar days. The breakdown of this time is 60 days for submittals, 308 days for construction to include weather days and 30 days for closeout documentation. Dollar magnitude for this contract is between $5,000,000 and $10,000,000. MBE (30%), WBE (6.90%), HUB (100%)
Award
Transportation Terminals
$6,374,099.00
Public - Federal
Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2025
May 15, 2025
To Be Determined, Charleston, SC
Related To This Project
Charleston, SC
Bid Date: Dec 06 2024
Charleston, SC
Bid Date: Dec 10 2024
Charleston, SC
Bid Date: Dec 06 2024
Charleston, SC
Bid Date: Dec 18 2024
Charleston, SC
Bid Date: Aug 01 2019
Charleston, SC
Bid Date: Dec 18 2024
Charleston, SC
Bid Date: Dec 19 2024
Charleston, SC
Bid Date: Feb 12 2025
Charleston, SC
Bid Date: Dec 05 2024
Charleston, SC
Bid Date: Dec 10 2024
Charleston, SC
Bid Date: Nov 26 2024
Charleston, SC
Bid Date: Nov 21 2024
Charleston, SC
Bid Date: Dec 05 2024
Charleston, SC
Bid Date: Nov 12 2024
Charleston, SC
Bid Date: Nov 11 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.