BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 2, 2025 at 8:00 PM

Updated July 3, 2025

Site work for a road / highway in El Paso, Texas. Completed plans call for site work for a road / highway.

Award: Jordan Foster Construction - $13,758,773.85 Cost estimate: $17,947,093.40 This Project Consists of the Widening of John Hayes Street From 2-lanes to a 6-lane Divided Roadway to Include Pedestrianpath, Sidewalk, Shared Use Path, Retention Pond Modifications, Illumination, Signing and Striping, Aesthetics, and Irrigation, From Pellicano Drive to Montwood Drive (Approximately 3 Miles). Bidder Requirement: Proposal Volume I of Ii (Bid Packet) Will Only Be Issued to Proposed Bidders That: (1) Are Texas Department of Transportation (Txdot) Prequalified Contractors, Qualified Under Item 2l Section 2 Instructions to Bidders of the Txdot Local Government General Requirements and Covenants; and (2) Have Not Been Determined by the Crrma to Have Been in Default Under a Crrma Contract Within the Past Three (3) Years. The Crrma Reserves the Right to Accept or Reject Any or All Bids, to Waive All Technicalities, and to Accept the Bid or Bids Most Beneficial to the Crrma, as Applicable.

Award

Roads / Highways

$13,758,773.00

Public - City

Site Work

353

10

25

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
12
Bidding Soon
247
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

July 14, 2025

Project location map

John Hayes St, El Paso, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.