BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 23, 2024 at 7:00 PM

Updated December 24, 2024

Site work and paving for a civil project in Sewickley, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The description and location of the project is as follows:For the roadway paving, drainage, guide rail, slope repairs, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4037, SECTION A01, in ALLEGHENY COUNTY, SEWICKLEY HEIGHTS and EDGEWORTH BOROUGHS, Commonwealth of Pennsylvania.This project being situated as follows:From a point on SR 4037 at Segment 0010 Offset 0000 (Station 100+00.00) to Segment 0020 Offset 3045 (Station 148+54.44, all within a length of 4,835 linear feet (0.916 miles) as indicated on the approved drawings included in the bid package. For the Roadway Paving, Drainage, Guide Rail, Slope Repairs, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 4037, Section A01, in Allegheny County, Sewickley Heights and Edgeworth Boroughs, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point on Sr 4037 at Segment 0010 Offset 0000 (Station 100+00.00) to Segment 0020 Offset 3045 (Station 148+54.44, All Within a Length of 4,835 Linear Feet (0.916 Miles) as Indicated on the Approved Drawings Included in the Bid Package. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 46.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an addendum. The deadline for submitting questions is 72 hours before the let date and time. For emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Way Hollow Road - Turnback *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$4,100,000.00

Public - State/Provincial

Paving, Site Work

111

17

16

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
253
Active Projects
121
Bidding Soon
2,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

January 27, 2025

Project location map

SR-4037, Sewickley, PA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.