Site work and paving for a civil project in Sewickley, Pennsylvania. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The description and location of the project is as follows:For the roadway paving, drainage, guide rail, slope repairs, and other miscellaneous construction, as indicated on the approved drawings included in the bid package for STATE ROUTE 4037, SECTION A01, in ALLEGHENY COUNTY, SEWICKLEY HEIGHTS and EDGEWORTH BOROUGHS, Commonwealth of Pennsylvania.This project being situated as follows:From a point on SR 4037 at Segment 0010 Offset 0000 (Station 100+00.00) to Segment 0020 Offset 3045 (Station 148+54.44, all within a length of 4,835 linear feet (0.916 miles) as indicated on the approved drawings included in the bid package. For the Roadway Paving, Drainage, Guide Rail, Slope Repairs, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 4037, Section A01, in Allegheny County, Sewickley Heights and Edgeworth Boroughs, Commonwealth of Pennsylvania. This Project Being Situated as Follows: From a Point on Sr 4037 at Segment 0010 Offset 0000 (Station 100+00.00) to Segment 0020 Offset 3045 (Station 148+54.44, All Within a Length of 4,835 Linear Feet (0.916 Miles) as Indicated on the Approved Drawings Included in the Bid Package. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: Non - Federal (100% State) Structure Work: 46.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Resurfacing/overlays Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an addendum. The deadline for submitting questions is 72 hours before the let date and time. For emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Way Hollow Road - Turnback *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$4,100,000.00

Public - State/Provincial

Paving, Site Work

111

17

16

7

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Retaining Walls, Planting, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
143
Bidding Soon
1,206
All Active Projects
571
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

January 27, 2025

img_map_placeholder

SR-4037, Sewickley, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Way Hollow Road - Turnback

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.