Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published December 24, 2024 at 7:00 PM
Updated December 25, 2024
Renovation of a clubhouse / community center in Yuma Proving Ground, Arizona. Completed plans call for the renovation of a clubhouse / community center.
Questions Due Date: Dec 9th 2024, 11:00 AM MST Online Portal Switchboard replacement and minor general/architectural work to partition off electrical switchboard into dedicated electrical room per APS requirements. The Work shall be substantially complete within 462 calendar days after the date when the Contract Times commence to run as provided in the Notice to Proceed, and all Work shall be finally completed and ready for final payment in accordance with the Notice to Proceed within 492 calendar days after the date when the Contract Times commences to run. The City and Contractor recognize that time is of the essence for this Contract and that the City will suffer financial loss, in addition to and apart from the costs described in Paragraph 3.2, if the Work and/or portions of the Work are not performed and completed within the times specified in Section 2, plus any extensions thereof allowed in the Contract Documents. The City and Contractor also recognize the delays, expense, and difficulties involved in proving, through legal or arbitration proceedings, the actual loss suffered by the City if the Work or portion of the Work is not completed on time. Accordingly, instead of requiring any such proof, the City and Contractor agree that the amounts per day set forth herein are reasonable estimates of such liquidated damages for delay (but not as a penalty) and that said amounts do in fact bear a reasonable relationship to the damage that would be sustained by the City, and Contractor agrees to pay such liquidated damages from the Notice to Proceed as herein provided. 3.1.1 Contractor shall pay the City four hundred ninety dollars and zero cents ($490.00) for each calendar day that passes after the time specified for Substantial Completion (462 calendar days from the date of the Notice to Proceed) until the Work is substantially complete. 3.1.2 After Substantial Completion, if Contractor shall neglect, refuse or fail to complete the remaining Work within the Contract Time or any proper extension thereof granted by the City, Contractor shall pay the City two hundred Fifteen dollars and zero cents ($215.00) for each calendar day that passes after the time the Work has been deemed substantially complete which also extends beyond the 30 calendar days specified in Section 2.3, until such time as the Work is finally complete and ready for final payment. CIP no - 0047-SEWER14
Post-Bid
Clubhouse / Community Centers
$80,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 17, 2024
January 16, 2025
1440 W Desert Hills Dr, Yuma Proving Ground, AZ
Related To This Project
Yuma Proving Ground, AZ
Bid Date: Feb 18 2025
Yuma Proving Ground, AZ
Bid Date: Feb 12 2025
Yuma Proving Ground, AZ
Bid Date: Mar 14 2025
Yuma Proving Ground, AZ
Bid Date: Feb 27 2025
Yuma Proving Ground, AZ
--
Yuma Proving Ground, AZ
--
Yuma Proving Ground, AZ
--
Yuma Proving Ground, AZ
--
Yuma Proving Ground, AZ
Bid Date: Dec 03 2024
Yuma Proving Ground, AZ
Bid Date: Nov 21 2024
Yuma Proving Ground, AZ
--
Yuma Proving Ground, AZ
Bid Date: Oct 17 2024
Yuma Proving Ground, AZ
Bid Date: Oct 10 2024
Yuma Proving Ground, AZ
--
Yuma Proving Ground, AZ
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed