BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2025 at 7:00 PM

Updated January 15, 2025

Site work, paving and outdoor lighting for a civil project in Mableton, Georgia. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; water / sewer project; and water / sewer project.

Construction of South Gordon Road at Pisgah Road The Complete Advertisement for Bids May Be Found at online. The time allowed for performance of the project will be 450 from the Notice to Proceed. Liquidated damages of $1,000.00 per consecutive calendar day shall be assessed for failure to complete the project within the specified time frames Furnishing All Labor, Material, Equipment and Other Things Necessary for the Complete Construction of: Project No./project Name: B2310 / South Gordon Road at Pisgah Road Project Description: Project Consists of Intersection Improvements to the South Gordon Road at Pisgah Road/crossing Creek Point Intersection to Include the Construction of a Roundabout and Raised Median, Addition of Turn Lanes, Pedestrian Improvements, Striping Modifications, and Street Lighting. Cobb County Water System Work is Included in This Project. Project Duration: the Time Allowed for Performance of the Project Will Be 450 Days From Issuance of Notice to Proceed. All New Prospective Bidders Are Strongly Encouraged to Pre-register With Cobb County Finance Prior to Bid Closing. Contractor and Their Subcontractors Are Required to Be in Compliance With the "Georgia Security and Immigration Compliance Act." Cobb County Will Affirmatively Comply With Title Vi of the Civil Rights Act of 1964 and 78 Stat. 252, 42 Usc 2000d-42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle a, Office of the Secretary, Part 21 Nondiscrimination Act(S). Disadvantaged Business Enterprise (Dbe) Participation and Small Business Participation in All Dot Contracts is Encouraged. The Cobb County Board of Commissioners Reserves the Right to Reject All Bids and Waive Any Formalities

Bid Results

Roads / Highways

$228,880.00

Public - County

Outdoor Lighting, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
2
Bidding Soon
1,182
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 20, 2025

Project location map

South Gordon Rd SW & Pisgah Rd SW, Mableton, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.