BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a multi-residential development in McKay's, Newfoundland. Completed plans call for the renovation of a multi-residential development.

Closing Time: 12:00 PM (NT) Question Acceptance Deadline 2024/11/25 12:00:00 PM NST 1.1 General .1 Provide all labour, materials, equipment, superintendence, temporary facilities, permits and administration necessary to perform the work outlined below and described in greater detail in this specification and drawings attached hereto and forming part of the documents for this project. 1.2 Project .1 Work on this project include, but is not limited to, electric heat conversions and associated repairs (from oil) on two bungalows in Saint Fintans, and 587 Fox Head Road, McKays. Both units are occupied. 1.3 Outline of Work .1 The following outline is general and is not to be considered complete in every detail. Before submitting a Tender, bidders shall carefully examine the contract documents and the site of the proposed work to full inform themselves of the existing conditions and limitations. No claim will be entertained or allowed for any labour, materials or other extras that may be required for the proper execution and completion of the contract, which could have been determined by site examination. Upgrade existing electrical service to 200 Amp, complete with new panel and all necessary electrical upgrades to bring electrical system up to current codes. 2 Demolition: .1) Removal of the following materials, but not limited to, electrical service (including mast and metre base) and associated fittings, and electrical panel (where specified). All materials not being reinstated are to be removed from site and disposed of at an approved disposal area. .2) Contractor is responsible to remove and re-install with the coordination of all utility companies, electrical, cable, and telephone connections. Contractor is responsible for all items damaged during construction. .3 Both Units: .1) Install electric baseboard heaters and wall mounted thermostats throughout each home, including basement areas. Heaters to be sized as per code requirements and best practices based on room size. In areas where space is limited, flush mount (in wall) fan forced heaters may be required. Conduit may be used in unfinished basement areas. Basement has open ceilings. Perform all electrical work to ensure existing system is up to current codes and standards. .2) Repair all areas affected by demolition and/or construction, including flooring, plaster, prime, and paint (if required). If walls are damaged or affected, redo the entire wall to nearest intersections, two (2) coats to match existing finish. .3) Install complete 200-amp breaker electrical service c/w meter base, mast, and panel. All work must be carried out in a manner which minimizes disruption(s) to tenants. Tenants must be advised at least 24 hours in advance of any disruption in service and all electrical must be fully operational at the end of each work day. Perform all electrical work to ensure existing system is up to current codes and standards. .4) Upgrade attic insulation. Bring current R32 levels to minimum R40, ensure adequate ventilation at eaves by use of true vents. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Award

Multi-Residential

$27,300.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
15
All Active Projects
9
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 25, 2024

December 25, 2024

img_map_placeholder

Multiple Locations, McKay's, NL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.