EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 21, 2025 at 7:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Philadelphia, Pennsylvania. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This Project Involves the Replacement of Montgomery County Bridge No. 38 (W. Moreland Avenue) Over a Branch of Pennypack Creek in Upper Moreland Township and the Borough of Hatboro. Project Duration: the Contractor Shall Have Nine Hundred and Twenty (920) Calendar Days From The Date of the Written Notice-to-proceed to Complete the Project in Accordance With the Conditions, Specifications and Provisions as Set Forth in This Contract. A Performance Bond in the Amount of One Hundred Percent (100%) of the Contract Sum, Conditioned Upon the Faithful Performance of the Contract in Accordance With the Contract Documents Shall Be Submitted. Such Bond Shall Be Executed on the Form Contained in the Bid Documents and Shall Be Solely for the Protection of County. A Payment Bond in the Amount of One Hundred Percent (100%) of the Contract Sum Shall Be Submitted. Such Bond Shall Be Executed on the Form Contained in the Bid Documents and Shall Be Solely for the Protection of Claimants Supplying Labor and Materials to the Contractor, or to Any of the Contractor's Subcontractors, in the Prosecution of the Work Provided for in Such Contract, and Shall Be Conditioned Upon the Prompt Delivery of Such Materials Furnished or Labor Supplied or Performed in the Prosecution of the Work. A Separate Maintenance Bond in an Amount Equal to 100% of the Total Contract Shall Be Furnished Prior to Final Payment as Security to Remedy All Defects Which May Develop During the Period of One (1) Year From the Date of Completion by the Contractor and Final Acceptance of the Work Performed in Accordance With the Contract Documents.

Award

Bridges / Tunnels

$3,473,253.00

Public - County

Demolition, New Construction, Paving, Site Work

116

7

2

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 08 - Openings

Division 08 - Openings

Hardware
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Backfill, Erosion and Sedimentation Controls, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection, Waterway Construction and Equipment, Waterway Scour Protection

Find More Local Projects

Within 75 Miles of This Project
494
Active Projects
261
Bidding Soon
4,321
All Active Projects
2,095
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 14, 2025

February 13, 2025

img_map_placeholder

W Moreland Ave, Philadelphia, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Replacement of Bridge #38 - Moreland Ave. over Branch of Pennypack Creek

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.