BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 14, 2025 at 7:00 PM

Updated August 19, 2025

Site work, paving and outdoor lighting for a mixed-use development in La Canada Flintridge, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; and for paving for a road / highway.

Traffic Signal Improvements at Foothill Blvd and Viro Rd Question Deadline 11/19/2024 at 2:00 PM PT Online Q&A Yes Scope of Services The general items of work include, but not limited to, clearing and grubbing; removal and installation of a new traffic signal equipment; removal and installation of a new electrical pedestal and rewiring the intersection; removal and replacement of ADA curb ramps, sidewalk, and curb and gutter; drainage improvements; removal and replacement of asphalt concrete pavement; signage and striping modification. Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% License Requirements A Liquidated Damages $1,500 per calendar day Start/Delivery Date 15 days from NTP Date - 2 NTP's will be issued - Please refer to the specifications Project Duration 2 NTP's will be issued - Please refer to the specifications *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated Bid Value $455,000 - $485,000

Award

Sidewalks / Parking Lot

$581,018.00

Public - City

Outdoor Lighting, Paving, Site Work

8

6

5

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
70
Bidding Soon
3,780
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 27, 2024

December 27, 2024

Project location map

Foothill Blvd & Viro Rd, La Canada Flintridge, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.