Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 2, 2024 at 7:00 PM
Updated December 4, 2024
Site work for a water / sewer project in Enterprise, Alabama. Working plans call for site work for a water / sewer project.
Enterprise City Schools - Maintenance Bldg. & Bus Shop In-Place Closure of Underground Storage Tanks & Installation of Aboveground Fuel Storage System Proposed Construction Period May 1 - July 31, 2025 Project Manager & Environmental Consultant: Environmental-Materials Consultants, Inc. The Enterprise City School District is proposing to upgrade their current gasoline and diesel underground storage tank system into a new aboveground storage tank system. The project is to be performed during the 2025 summer break period when the existing fuel system can be shut down. The new AST system must be in full operation before the beginning of the new school year. Completion date is July 31, 2025.
Final Planning
Water / Sewer
$750,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 1, 2025
1648 E Park Ave, Enterprise, AL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
