BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 15, 2025 at 7:00 PM

Updated December 16, 2025

Site work and paving for a civil project in Comstock, North Dakota. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.

Proposed Work Consists of 0.3600 Miles of Structure Repairs, Mill and Hma Overlay, and Guardrail Located Nd 1, 2.5 Mi S of Pekin; Nd 17, 4.5 Mi E of Cando; Nd 19, 3 Mi W Jct Nd 30; Us 52, .5 Mi W Jct Us 281/nd 200 (Carrington) And Involves Approximately: 1 L Sum Contract Bond; 1 L Sum Railway Protection Insurance; 1 L Sum Railroad Coordination; 1 L Sum Railroad Flagging; 1 L Sum Removal of Trees & Brush; 590 Sy Removal of Bituminous Surfacing; 735 Cy Borrow-excavation; 10 M Gal Water; 1.75 Acre Seeding Class Ii; 1.75 Acre Temporary Cover Crop; 3.5 Acre Hydraulic Mulch; 716 Ton Riprap Grade Ii; 180 Sy Remove & Replace Concrete Slope Protection; 309 Lf Silt Fence Unsupported; 309 Lf Remove Silt Fence Unsupported; 1526 Lf Fiber Rolls 12in; 763 Lf Remove Fiber Rolls 12in; 327 Lf Flotation Silt Curtain; 327 Lf Remove Flotation Silt Curtain; 266 Ton Aggregate Base Course Cl 5; 3364 Sy Milling Pavement Surface; 508 Ton Commercial Grade Hot Mix Asphalt; 1140 Sy Penetrating Water Repellent Treatment; 6327 Sf Special Surface Finish; 480 Lf Double Box Beam Rail Retrofit-free Standing; 188.6 Lf Remove & Reset Dbl Box Beam Retrofit - Free Stand; 63 Cy Overlay Concrete; 12 Cy Deck Concrete; 1118 Sy Class 1-h Removal; 1118 Sy Class 1 Removal; 61 Sy Class 3 Removal; 17 Sy Class 4 Removal; 198 Sf Deck Spall Repair; 1 L Sum Mobilization; 325 Mhr Flagging; 8063 Unit Traffic Control Signs; 4 Ea Lane Closure-signal Control/flagging Control; 2 Ea Attenuation Device-type B-45; 6 Ea Attenuation Device-type B-65; 6 Ea Portable Rumble Strips; 10 Ea Type Iii Barricade; 40 Ea Delineator Drums; 45 Ea Tubular Markers; 4525 Sf Obliteration of Pavement Marking; 1390 Lf State Furnished Median Barrier; 4 Ea Portable Changeable Message Sign; 632 Sy Geosynthetic Material Type Rr; 12548 Lf Short Term 6in Line-type R; 96 Lf Short Term 24in Line-type R; 3240 Lf Short Term 6in Linetype Nr; 14758 Lf Pvmt Mk Painted 6in Line; 716 Lf W-beam Guardrail; 8 Ea W-beam Guardrail End Terminal; 313 Lf Remove & Reset Guardrail; 413 Lf Remove W-beam Guardrail & Posts; 615 Lf Remove Box Beam Guardrail; 6 Ea Remove End Treatment & Transition; 1 Cy Controlled Density Backfill; 685 Lf Silicone Sealant; 361 Lf Crack Sealing; 8 Ea Modify Deck Drain; 341 Sf Spall Repair; 60 Lf Joint Treatment. *** End of Project 23420*** Bid Range $2,000,001 to $2,500,000 Time October 10, 2026 Prequalification is required for all bidders submitting a bidding proposal form. Prequalification is required annually. Prequalified contractors who wish to renew their prequalification must submit a complete "Contractor's Prequalification Statement" by July 1 of each calendar year. Bidders who are not currently prequalified must submit a complete "Contractor's Prequalification Statement" at least 10 business days prior to the date of the bid opening. Information is available from the Construction Services Division of the North Dakota Department of Transportation. Contractor's License--A contractor is not required to have a license from the state of North Dakota before bidding on any project, however, no contract will be awarded unless said contractor holds a current North Dakota license in the class within which the value of the contract falls. Contractors are required to meet the provisions of the Contract Work Hours and Safety Standards Act on the federal aid projects, are required to meet the Fair Labor Standards Act on all projects, and are required to pay any minimum wage rates set forth in the proposal form. A bid guarantee is required by Section 24-02-20, NDCC. The bid guarantee may be a bid bond equal to 10 percent of the full amount of the bid or a cashier's check of the bidder on a solvent bank equal to 5 percent of the bid. Bid bond shall be on the department form SFN 14196. Prior arrangements may be made with the department to file bid guarantees in advance. The Department of Transportation and all bidders are obligated to affirmatively ensure that in any contract entered into pursuant to this advertisement, minority or women's business enterprises will be afforded a full opportunity to participate and to submit bids in response to this invitation and will not be discriminated against on the grounds of race, religion, color, sex, age, or national origin in consideration for an award. Where applicable the contractor must fulfill all special provision requirements for utilization of Disadvantaged Business Enterprises. The right is reserved to reject any and all proposals, to waive technicalities, or to accept such as may be determined to be for the best interests of the state. NDDOT - 23420 - Structure Repairs, Mill and HMA Overlay, and Guardrail *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Bridges / Tunnels

$1,900,143.00

Public - State/Provincial

Paving, Site Work

130

4

2

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
3
Bidding Soon
66
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2025

February 10, 2026

Project location map

Multiple Locations, Comstock, ND

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.