BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 20, 2025 at 7:00 PM

Updated November 21, 2025

Site work and paving for a mixed-use development in Huntersville, North Carolina. Conceptual plans call for site work for a road / highway; for paving for a bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; and bridge / tunnel.

This project will repair and improve paving and structures along Torrence Creek Greenway from Cedar River Road to McDowell Creek Greenway at Summerfield Lane, a greenway trail totaling approximately 2.4 miles with six access trails. The scope of this project may include repairs/replacement of paved greenway trail, bridges, boardwalks, and wayfinding. As of November 20, 2025, this project is in the conceptual phase. Construction is not expected to begin until 2028.

Conceptual

Roads / Highways

$5,846,988.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
136
Bidding Soon
1,578
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2028

Project location map

Torrence Creek Greenway, Huntersville, NC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.