BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Winnipeg, Manitoba. Contact the soliciting agency for additional information.

Reference Number 0000282371 Question Acceptance Deadline 2024/12/10 04:00:00 PM CST Manitoba Hydro is issuing this Request to seek the submission of competitive Proposals for environmental assessment (EA) and regulatory support consulting Services, to be provided on an as-required basis. The Services includes, but are not limited to, environmental assessment, licensing, and regulatory submissions in accordance with the Environment Act (Manitoba), Impact Assessment Act (Canada), and Canadian Energy Regulator Act (Canada), as required for the HVdc reliability project. Manitoba Hydro has three operating HVde Bipoles, as follows: Bipole I (Pole 1 and Pole 2) went into operation between 1973 and 1976 in three stages. Bipole II (Pole 3 and Pole 4) went into service in 1979 and 1986. Bipole III (Pole 5 and Pole 6) went into service in 2018. Radisson Converter Station and Henday Converter Station are the rectifiers for Bipole 1 and Bipole II respectively, located near Gillam, Manitoba. Dorsey Converter Station is the inverter for both Bipole I and Bipole II located near Rosser, Manitoba. Keewatinohk Converter Station is the rectifier for Bipole III located near Gillam, Manitoba and Riel Converter Station is the inverter located near Dugald, Manitoba. These three bipole systems are responsible for transmitting up to 4184 MW of hydro-electric power generated by four Nelson River Generating Stations (Kettle, Long Spruce, Limestone, and Keeyask) to Southern Manitoba's AC grid, which amounts to approximately 70% of Manitoba Hydro's total generation capacity. Bipole I and Bipole II systems require a modernization program to maintain level of service necessary for Manitoba Hydro customers. The modernization approach for Bipole II has been determined to be an in-situ refurbishment (brownfield) of the existing Bipole II converter station facilities. The modernization approach for Bipole I has not yet been determined, but both refurbishment (brownfield) and replacement or new-build (greenfield) options are currently under consideration and therefore the project may require an environmental assessment and submissions to provincial (Environment Act (Manitoba)) or federal regulators (Impact Assessment Act and Canadian Energy Regulator Act). To minimize potential impacts to the Bipole I modernization schedule, in the case where the final modernization approach selected by Manitoba Hydro for Bipole I is for greenfield development of new converter stations, activities to complete the environmental assessment for the Bipole I Project are currently taking place. The results of the assessment will be documented in an environmental impact statement (EIS). The target date for submission of the EIS is June 2026 and following submission, a Provincial environmental review will commence. The earliest anticipated start of construction by others for a Bipole I greenfield project would be December 2029 after appropriate environmental approvals have been obtained. Manitoba Hydro will develop an environmental protection plan Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Conceptual

Power Plant

Public - State/Provincial

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
7
Bidding Soon
211
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

img_map_placeholder

Multiple Locations, Winnipeg, MB

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.