BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 4, 2025 at 7:00 PM

Updated February 5, 2025

Site work for an educational facility in Sacramento, California. Completed plans call for site work for a educational facility.

In accordance with Public Contract Code section 20111, each bid shall be accompanied by cash, a cashier's or certified check, or a bidder's bond executed by an admitted surety insurer, made payable to the District, in an amount not less than ten percent (10%) of the maximum amount of the bid. The bid security shall be given as a guarantee that the Bidder to whom the Contract is awarded will execute the Contract Documents and will provide the required payment and performance bonds and insurance certificates within ten (10) days after the notification of the award of the Contract. (Project Value Between $60,000 and $200,000 The schedule of per diem wages is based upon a working day of eight (8) hours. The rate for holiday and overtime work shall be at least time and one half. No bid may be withdrawn for a period of sixty (60) days after the date set for the opening for bids, except as provided by Public Contract Code section 5100 et seq. Pursuant to Public Contract Code section 3300, the District requires that each Bidder must possess, at the time the Contract is awarded, the following classifications of California State Contractor's License: Contactor's License Classification(s): A or B. The Contractor's California State License number shall be clearly stated on the Bidder's proposal. Any Bidder not so duly and properly licensed shall be subject to all penalties imposed by law. No payment shall be made for work, labor, materials, or services provided under the Contract for the work unless and until the Registrar of Contractors verifies to the District that the Bidder awarded the Contract is properly and duly licensed to perform the work. A payment bond is required for a public works contract involving an expenditure in excess of twenty-five thousand dollars ($25,000.00). Separate payment and performance bonds, each in an amount equal to 100% of the total Contract amount, are required, and shall be provided to the District prior to execution of the Contract and shall be in the form set forth in the Contract Documents. All bonds (Bid, Performance, and Payment) must be issued by a California admitted surety insurer as defined in California Code of Civil Procedure section 995.120. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Educational

$72,050.00

Public - County

Site Work

10

5

7

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
488
Active Projects
253
Bidding Soon
2,505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

January 28, 2025

Project location map

477 Las Palmas Ave, Sacramento, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.