BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Moorhead, Mississippi. Completed plans call for site work for a water / sewer project.

Sewer System Improvements The principal items of work under this contract are: - Sewer system rehabilitation with cleaning, video inspection, cured-in-place pipe, point repairs, manhole rehabilitation, and miscellaneous work - 350 GPM Pump Station Rehabilitation (Complete) The Owner reserves the right to waive any informalities or to reject any and all bids, Each bidder must deposit with his bid, security in the amount, for and subject to the conditions provided in the Notice and Instructions to Bidders. Bidders must comply with the Anti-Kickback Act, the Contract Work Hours and Safety Standards Act, and the President's Executive Order No. 11246. All bids submitted in excess of $50,000 by a prime or subcontractor to do erection, building, construction, repair, maintenance, or related work, on public projects must comply with Section 31-3-21, Mississippi Code of 1972, must have a "Certificate of Responsibility" license. Where applicable, the foregoing certificate number and license number must be indicated on the exterior of the sealed bid envelope before it can be opened. Certification of Non-Segregated Facilities: The Contractor must complete the Certification of Non-Segregated Facilities included in the specifications. Based on the Assistance Listing: Coronavirus State and Local Fiscal Recovery Funds and Part 2 of the US Treasury State and Local Fiscal Recovery Funds Compliance and Reporting Guidance (v3.0 February2022) (Compliance Guide), the following Uniform Guidance provisions will be required in all contracts: o Subpart A, Acronyms and Definitions o Subpart B, General provisions o Subpart C, Pre-Federal Award Requirements and Contents of Federal Awards (except 2 CFR o 200.204, .205, .210, and .213) o Subpart D, Post Federal; Award Requirements (except 2 CFR 200.305(b)(8) & (9), .308, .309, o and .320(c)(4)) o Subpart E, Cost Principles o Subpart F, Audit Requirements o 2 CFR Part 25 (Universal Identifier & System for Award Management) o 2 CFR Part 170 (Reporting Subaward and Executive Compensation Information) o 2 CFR Part 180 (OMB Guidelines to Agencies on Governmentwide Debarment and Suspension o (Non-procurement) o 2 CFR 200 Appendix ii

Post-Bid

Water / Sewer

$300,000.00

Public - City

Site Work

20

13

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
11
Bidding Soon
141
All Active Projects
68
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

January 10, 2025

img_map_placeholder

Multiple Locations, Moorhead, MS

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.