BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 17, 2025 at 8:00 PM

Updated October 18, 2025

Site work, paving and outdoor lighting for a civil project in Cape Coral, Florida. Design plans call for site work for a road / highway; for paving for a road / highway; and for outdoor lighting for a road / highway.

As of October 17, 2025, an engineer has been selected, and this project is in the design phase. The project is expected to go out to bid January 2026. Engineer firm information and a firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Letter of Response and Interview Professional Liability Insurance : $250,000.00 Financial Management Numbers : 44895513201 44895513202 44895713202 45072313201 45072313202 Project Description : Lee County Resurfacing Various Locations Plain Language Description : The purpose of this Design Services contract is for the consultant to investigate the status of the projects and become familiar with the concepts and commitments developed from prior Project Development and Environmental studies as a design basis for resurfacing, restoration, and rehabilitation intended to extend the service life of the projects known as State Road 865 from East of State Road 45 (US 41) to West of Metro Parkway, State Road 78 from West of Santa Barbara Boulevard to West of Del Prado Boulevard, and State Road 82 from Ortiz Avenue to Colonial Boulevard in Lee County. TRC Members (Subject to Change) : David Bogner Jessica White Sean Pugh Longlist Date/Time 4/12/2023 Shortlist Selection Date/Time 4/25/2023 Phase II Submittal Deadline Date/Time 5/09/2023 Technical Review Committee Meeting 1 Date/Time 5/10/2023 Oral Presentation Date/Time 5/10/2023 Final Selection Date/Time 5/23/2023 Negotiations Period Begin Date 5/31/2023 Negotiations Period Ending Date 7/01/2023 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Lee County Resurfacing Various Locations

Design

Roads / Highways

$4,740,819.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
68
Bidding Soon
994
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

March 2, 2026

Project location map

Multiple Locations, Cape Coral, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.