EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 7, 2025 at 7:00 PM

Updated October 1, 2024

Renovation of an educational facility in Baltimore, Maryland. Completed plans call for the renovation of a educational facility.

**As of March 7, 2025, this project has not yet been awarded. A timeline for award has not yet been established.** Question Deadline 12/10/2024 at 4:00 PM ET For questions and/or concerns related to this requirement please contact: Manager, Environmental Compliance Department of Health & Safety, Room 407A Baltimore City Public Schools 200 E. North Avenue Baltimore, MD 21202 Office 443-984-3617 Fax 410-659-6937 All work under this contract shall be completed within twelve (12) months or 365 days from the issuance of the Notice to Proceed letter. If however, as a result of any act or omission by Baltimore City Public Schools and not by any fault of the respondent, or in the event that City Schools agrees that as a result of force majeure (strikes, acts of God, etc.) certain days are not chargeable as contract work days, the allotted time for work completion shall be increased by the number of days that City Schools determines work progress had been delayed or suspended. No compensation will be awarded for contract duration extensions. All prospective bidders may question the amount of completion time allowed and secure adjustments if circumstances warrant, before bids are submitted.

Bid Results

Educational

$507,396.00

Public - City

Renovation

33

18

6

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Scheduling of Work, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Assurance, Installer Qualifications, Field Samples, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Construction Aids, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Metal Joists, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Maintenance Coatings, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Flooring, Wood Flooring, Resilient Flooring, Carpeting, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Safety Specialties, Fire Protection Specialties, Fire Extinguishers
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Custom Elevator Cabs, Lifts, Scaffolding, Other Conveying Equipment, Facility Chutes
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Sanitary Sewerage, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Enclosed Switches and Circuit Breakers, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting, Emergency Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Hoists, Lifting Devices, Lifts, Mobile Plant Equipment, Mobile Earth Moving Equipment, Compactors

Find More Local Projects

Within 75 Miles of This Project
233
Active Projects
128
Bidding Soon
2,400
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

February 10, 2025

img_map_placeholder

1300 Gorsuch Ave, Baltimore, MD


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Elevator Replacement at Abbottston Building #050

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.