BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Peachtree City, Georgia. Completed plans call for site work for a water / sewer project.

The Peachtree City Water & Sewerage Authority will be receiving separate sealed Bids for all material, labor and equipment for the "Pump Station 2 Wetwell Improvements". This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications: Improvements proposed for this project include the installation of a new manhole to replace an existing wetwell. Refer to the Technical Specifications for complete details. This contract is local funded. The project shall be Substantially Complete within 90 calendar days from the date of Notice to Proceed of the contract. Liquidated Damages shall be assessed in the amount of $300 per day for each calendar day required to achieve Substantial Completion. The project shall be Final Complete within 30 calendar days beyond Substantial Completion. Liquidated Damages shall be assessed in the amount of $500 per day for each calendar day required to achieve Final Completion. The contract will be awarded to the low, responsive, and responsible bidder with reservation of right to reject all bids. Bids may not be withdrawn by Bidders for 60 days following opening of the bids. The Peachtree City Water & Sewerage Authority provides assurances to Bidder that all anticipated Federal, State, and Local Permits along with anticipated Rights of Way and Easements have been obtained or will be obtained by NTP. The Peachtree City Water & Sewerage Authority will not issue or cause to be issued any addenda modifying the Project Manual or Construction Drawings within a period of 72 hours prior to the advertised time for opening bids, excluding Saturdays, Sundays, and State of Georgia Legal Holidays. Question Deadline 01/02/2025 To Nathan Brooks, contracts@pcwasa.org and Davis Ozier, dozier@intse.com. Questions received less than five business days prior to the date for opening of Bids may not be answered

GC Bidding

Water / Sewer

$85,000.00

Public - City

Site Work

7

15

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
52
Bidding Soon
1,537
All Active Projects
544
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

January 28, 2025

img_map_placeholder

To Be Determined, Peachtree City, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.