Published December 11, 2024 at 7:00 PM

Updated December 12, 2024

Site work and renovation of a civil project in Thief River Falls, Minnesota. Completed plans call for the renovation of a water / sewer project; and water / sewer project.

The Work is comprised of one (1) Contract: Contract No. 1 - General Construction. The Work for this Contract is generally described as follows: Contract No. 1: General Construction: Work generally consists of the demolition and removal of an existing 26 ton liquid carbon dioxide storage tank and mounting skid; refrigeration unit; vaporizer; heater; fill station; piping; valves; gauges; electrical connections and equipment; and associated appurtenances. Work also generally consists of the furnishing and installation of a new 26 ton liquid carbon dioxide storage tank and mounting skid; refrigeration unit; vaporizer; heater; fill station; piping; valves; gauges; electrical connections and equipment; and associated appurtenances as well as a temporary liquid carbon dioxide storage and supply system while the work is being completed. The work for each contract must be completed no later than the following: Substantial Completion: November 26, 2025 Final Completion: December 31, 2025 All Bids shall be prepared according to Section 00 21 13 - Instructions to Bidders contained within the Project Manual and must include: 1. Acknowledgement by the Bidder of Receipt of all Project Addenda. a) Prospective Bidders will be required to download all addenda in order to submit an online bid. Submittal of an online bid will be taken as acknowledgement of all addenda. 2. Bid security: must be in a sum equal to five percent (5%) of the full amount of the bid and must be in the form of a bidder's bond. A bidder's bond must be executed by the bidder as principal and by a surety, conditioned that if the principal's bid is accepted and the contract awarded to the principal, the principal, within ten (10) days after the notice of award, shall execute a contract in accordance with the terms of the bid and the bid bond and any condition of the governing body. A countersignature of a bid bond is not required under this section. If a successful bidder does not execute a contract within the ten (10) days allowed, the bidder's bond must be forfeited to the governing body and the project awarded to the next lowest responsible bidder. No Bid will be read or considered that does not fully comply with the above provisions and other provisions contained within the Bidding Documents, and any deficient Bid submitted will be unopened. All Bids will be made on the basis of cash payment for such work. The City of Thief River Falls, reserves the right to hold all bids for a period of sixty (60) days after the first day fixed for the opening of the bids, and the right to reject any or all bids and to waive any formalities.

Bid Results

Water / Sewer

$543,000.00

Public - City

Renovation, Site Work

13

15

2

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
23
Bidding Soon
144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 11, 2024

January 10, 2025

Project location map

To Be Determined, Thief River Falls, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.