BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated March 8, 2025

Site work for a civil project in Tallassee, Alabama. Completed plans call for site work for a water / sewer project.

As of February 6,2025. Contract #1-Elevated Water Storage Tank was awarded to Phoenix Fabricators and Erectors, LLC.$1,501,444.Sd:3/1/2025. Contract #2-Booster Pump Station was awarded to Ballard Construction Co., Inc.$416,000 no sd. Contract #3-Water Main Replacement was awarded to South Alabama Contracting, LLC $1,270,542 sd:3/10/2025. Sealed Bids for the construction of the Water System Improvement Project. The Project consists of constructing a 250,000 gallon elevated water storage tank, a 250 gpm water booster pump station, and replacing approximately 16,800 feet of existing water mains with new 8" PVC water mains and necessary appurtenances. Separate Bids will be received for the following Contracts: Contract No. 1-Elevated Water Storage Tank, Estimate=$1,500,000, Contract time=300 days Contract No. 2-Booster Pump Station, Estimate=$355,000, Contract time=90 days Contract No. 3-Water Main Replacement, Estimate=$1,360,000, Contract time=150 days All bidders must register as an official plan holder with the engineer no later than 48 hours prior to the bid opening. The owner reserves the right to waive any informalities and reject any or all bids. Bid security shall be furnished in accordance with the Instruction to Bidders. Bidders shall submit proof of qualifications to perform the Work as described in the Instructions to Bidders. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all partiesrecorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Bid Results : Contract No. 1-Elevated Water Storage Tank Tabulation of Bids Phoenix Fabricators & Erectors, LLC $1,700,227.00 Contract No. 2-Booster Pump Station Tabulation of Bids L & K Contracting, Inc. $278,017.00 Contract No. 3-Water Main Replacement Tabulation of Bids South Alabama Contracting, LLC $1,270,542.00

Award

Water / Sewer

$3,187,986.00

Public - State/Provincial

Site Work

43

41

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
70
Bidding Soon
665
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

February 10, 2025

Project location map

Multiple Locations, Tallassee, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.