Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 14, 2024 at 7:00 PM
Updated December 15, 2024
Site work and paving for a mixed-use development in Dallas, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Street Reconstruction Group 17-1008 1. Kernack Street from Phinney Avenue to Burns Avenue- PB17V237 2. West 12th Street from Briscoe Boulevard to Superior Street PB17V192 3. Waneta Drive from Robin Road to Inwood Road- PB17V244 Question Deadline 12/06/2024 at 5:00 PM CT Vendors shall submit project related questions via email to the Project Manager: Hossein Kheiri, 214-948-4108, hossein.kheiri@dallas.gov. Deadline to submit Questions electronically Kernack Street from Phinney Avenue to Burns Avenue PB17V237 Paving and Drainage Improvements: Street reconstruction of Kernack St., for approximately 920 linear feet of 26-feet wide, 8- inch thick, 4000 PSI machine-poured or 4500 PSI hand-poured reinforced concrete pavement with curbs and gutters, sidewalk, driveway approaches, paving marking, replacement of the storm drainage system and other miscellaneous items necessary to complete the project. Water/Wastewater: N/A Attention Bidders: Construction activities on Kernack Street (PB17V237) should begin during the school summer holidays. Coordinate all construction activities affecting L.O. Donald Elementary School with the school officials and Dallas Independent School District. West 12th Street from Briscoe Boulevard to Superior Street PB17V192 Paving and Drainage Improvements: Street reconstruction of West 12th St., for approximately 630 linear feet of 30-feet wide, 6-inch thick, 4000 PSI machine-poured or 4500 PSI hand-poured reinforced concrete pavement with curbs and gutters, sidewalk, driveway approaches, paving marking, and other miscellaneous items necessary to complete the project. Water/Wastewater: Replace approximately 790 linear feet of water line and 560 linear feet of wastewater line. Waneta Drive from Robin Road to Inwood Road PB17V244 Paving and Drainage Improvements: Street reconstruction of Waneta Dr., for approximately 430 linear feet of 26-feet wide, 6- inch thick, 4000 PSI machine-poured or 4500 PSI hand-poured reinforced concrete pavement with curbs and gutters, sidewalk, driveway approaches, paving marking, replacement of the storm drainage system and other miscellaneous items necessary to complete the project.
Post-Bid
Roads / Highways
$1,000,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 13, 2024
January 13, 2025
Multiple Locations, Dallas, TX
Related To This Project
Dallas, TX
--
Dallas, TX
Bid Date: Jan 02 2025
Dallas, TX
Bid Date: Dec 19 2024
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
--
Dallas, TX
Bid Date: Jan 03 2025
Dallas, TX
Bid Date: Nov 26 2024
Dallas, TX
Bid Date: Dec 09 2024
Dallas, TX
Bid Date: Dec 13 2024
Dallas, TX
--
Dallas, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
