Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 11, 2024 at 7:00 PM
Updated December 12, 2024
Site work and paving for a civil project in Tucker, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Lewis Road at Rock Mountain Blvd Operational Improvement Project++ . This work generally entails grading, demolition, asphalt paving, curb and gutter, storm line installation, striping and all related materials. A 5% bid bond is required. DBE's are strongly encouraged to submit a bid but no DBE percentage is required.100% Payment and Performance Bonds will be required on this project. All questions regarding the bid documents shall be made via email to CID Project Engineer; Larry Kaiser, PE, at kaiser@co-infra-services.com. The deadline to submit questions is no later than 5:00 PM; December 2, 2024. Project is jointly funded by the City of Tucker and the Tucker Summit CID. Contractors submitting a bid must be GDOT pre-qualified. The Owner reserves the right to reject any or all bids and to waive technicalities and informalities The project shall be Substantially Complete within 60 calendar days from the date of notice to proceed. Liquidated damages of $500 per day will be assessed for each and every consecutive calendar day for which the completion of the project is delayed beyond the 60 calendar days; except for quantifiable weather events
Post-Bid
Roads / Highways
$300,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2024
January 9, 2025
Lewis Rd, Tucker, GA
Related To This Project
Tucker, GA
Bid Date: Mar 13 2025
Tucker, GA
Bid Date: Apr 24 2025
Tucker, GA
Bid Date: Apr 24 2025
Tucker, GA
Bid Date: Apr 29 2025
Tucker, GA
Bid Date: May 19 2025
Tucker, GA
Bid Date: Jun 12 2025
Tucker, GA
Bid Date: Jun 18 2025
Tucker, GA
Bid Date: Jun 24 2025
Tucker, GA
Bid Date: Jan 06 2025
Tucker, GA
Bid Date: Dec 20 2024
Tucker, GA
Bid Date: Oct 31 2024
Tucker, GA
Bid Date: Sep 30 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
