BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Westerly, Rhode Island. Completed plans call for the renovation of a educational facility.

Reference Number 0000369239 Questions regarding this solicitation must be emailed and received by the Purchasing Agent at ecardillo@westerlyri.gov no later than 12:00 pm on December 12, 2024, in a Microsoft Word attachment with the corresponding solicitation number Furnish and install new ductless air conditioning units to provide cooling to various IT and classroom spaces throughout the school district. This will include removal of all non-functioning and unreliable units and installation of Mitsubishi or equivalent heat pumps capable of cooling the IT spaces at low outdoor air ambient temperatures. Existing functioning Mitsubishi units will remain. The installation of the new units will also include the installation and set-up of new BacNet interfaces for the new equipment and existing Mitsubishi systems. This will allow integration to any future native BacNet control system. Project completion must be prior to 9/1/25. Springbrook Elementary School - 39 Springbrook Rd. Westerly, RI 02891 Main IT room - 1 Install New Split System 1.1 Supply and install one Mitsubishi PUZ-A18NKA 18,000 BTU per hour ductless split condensing units and one Mitsubishi PKA-A18LA wall mounted evaporators per manufacturer's instructions 1.2 Provide wall cutting, drilling and patching 1.3 Provide roof cutting and patching 1.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing units from nearest electrical panel 1.5 Supply and install new wall mounted wired thermostat controllers. 1.6 Supply install and configure factory provided BacNet interface 1.7 Supply and install condensate connections to the nearest suitable drain 1.8 Start-up and testing of the new units Classrooms 1 - 7 2 Demo Existing Split System. 2.1 Reclaim existing unit. Catalog Freon per EPA guidelines 2.2 Remove or replacing wiring as needed 2.3 Remove all old piping and insulation. 2.4 Clean up and dispose of all equipment, material, refrigerant and oil properly 3 Install New Split System 3.1 Supply and install one Mitsubishi PUZ-A36NKA 36,000 BTU per hour ductless split condensing units and one Mitsubishi PLA-A36 ceiling mounted evaporators per manufacturer's instructions in each of the six classrooms 3.2 Provide wall cutting, drilling and patching 3.3 Provide roof cutting and patching 3.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing units from nearest electrical panel 3.5 Supply and install new wall mounted wired thermostat controllers. 3.6 Supply install and configure factory provided BacNet interface 3.7 Supply and install condensate connections to the nearest suitable drain 3.8 Start-up and testing of the new units Main Office 4 Install New Split System 4.1 Supply and install one Mitsubishi MXZ-SM48NAMHZ-U1 4 ton Smart Multi Zone Hyper Heat and one PKFYP18NLMU-ER1 18,000 btu Wall Mounted unit, three PKFY-P08NLMUER1 8,000 btu Wall Mounted unit, two PKFY-P04NLMU-ER1 4,000 btu Wall Mounted unit (N Gen Only) evaporators per manufacturer's instructions 4.2 Provide wall cutting, drilling and patching 4.3 Provide roof cutting and patching 4.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing units from nearest electrical panel 4.5 Supply and install new wall mounted wired thermostat controllers. 4.6 Supply install and configure factory provided BacNet interface 4.7 Supply and install condensate connections to the nearest suitable drain 4.8 Start-up and testing of the new units Westerly Middle School - 10 Sandy Hill Rd. Westerly, RI 02891 Main IT room - 1 Demo Existing Split System x2 1.1 Reclaim existing units. Catalog Freon per EPA guidelines 1.2 Remove or replacing wiring as needed 1.3 Remove all old piping and insulation. 1.4 Clean up and dispose of all equipment, material, refrigerant and oil properly 2 Install New Split System 2.1 Supply and install two Mitsubishi MUZ-FS12NA-U1 12,000 BTU per hour ductless split condensing units and two Mitsubishi MSZ-FS12NA wall mounted evaporators per manufacturer's instructions 2.2 Provide power wiring to new indoor evaporator and condensing units using existing unit power feeds 2.3 Supply and install new wall mounted wired thermostat controllers. 2.4 Supply install and configure factory provided BacNet interface 2.5 Supply and install condensate connections to the nearest suitable drain 2.6 Start-up and testing of the new units

Sub-Bidding

Educational

$80,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
134
Bidding Soon
2,716
All Active Projects
1,095
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 20, 2025

img_map_placeholder

10 Sandy Hill Rd, Westerly, RI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.