Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Westerly, Rhode Island. Completed plans call for the renovation of a educational facility.
Reference Number 0000369239 Questions regarding this solicitation must be emailed and received by the Purchasing Agent at ecardillo@westerlyri.gov no later than 12:00 pm on December 12, 2024, in a Microsoft Word attachment with the corresponding solicitation number Furnish and install new ductless air conditioning units to provide cooling to various IT and classroom spaces throughout the school district. This will include removal of all non-functioning and unreliable units and installation of Mitsubishi or equivalent heat pumps capable of cooling the IT spaces at low outdoor air ambient temperatures. Existing functioning Mitsubishi units will remain. The installation of the new units will also include the installation and set-up of new BacNet interfaces for the new equipment and existing Mitsubishi systems. This will allow integration to any future native BacNet control system. Project completion must be prior to 9/1/25. Springbrook Elementary School - 39 Springbrook Rd. Westerly, RI 02891 Main IT room - 1 Install New Split System 1.1 Supply and install one Mitsubishi PUZ-A18NKA 18,000 BTU per hour ductless split condensing units and one Mitsubishi PKA-A18LA wall mounted evaporators per manufacturer's instructions 1.2 Provide wall cutting, drilling and patching 1.3 Provide roof cutting and patching 1.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing units from nearest electrical panel 1.5 Supply and install new wall mounted wired thermostat controllers. 1.6 Supply install and configure factory provided BacNet interface 1.7 Supply and install condensate connections to the nearest suitable drain 1.8 Start-up and testing of the new units Classrooms 1 - 7 2 Demo Existing Split System. 2.1 Reclaim existing unit. Catalog Freon per EPA guidelines 2.2 Remove or replacing wiring as needed 2.3 Remove all old piping and insulation. 2.4 Clean up and dispose of all equipment, material, refrigerant and oil properly 3 Install New Split System 3.1 Supply and install one Mitsubishi PUZ-A36NKA 36,000 BTU per hour ductless split condensing units and one Mitsubishi PLA-A36 ceiling mounted evaporators per manufacturer's instructions in each of the six classrooms 3.2 Provide wall cutting, drilling and patching 3.3 Provide roof cutting and patching 3.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing units from nearest electrical panel 3.5 Supply and install new wall mounted wired thermostat controllers. 3.6 Supply install and configure factory provided BacNet interface 3.7 Supply and install condensate connections to the nearest suitable drain 3.8 Start-up and testing of the new units Main Office 4 Install New Split System 4.1 Supply and install one Mitsubishi MXZ-SM48NAMHZ-U1 4 ton Smart Multi Zone Hyper Heat and one PKFYP18NLMU-ER1 18,000 btu Wall Mounted unit, three PKFY-P08NLMUER1 8,000 btu Wall Mounted unit, two PKFY-P04NLMU-ER1 4,000 btu Wall Mounted unit (N Gen Only) evaporators per manufacturer's instructions 4.2 Provide wall cutting, drilling and patching 4.3 Provide roof cutting and patching 4.4 Provide power wiring in EMT to new indoor evaporator and outdoor condensing units from nearest electrical panel 4.5 Supply and install new wall mounted wired thermostat controllers. 4.6 Supply install and configure factory provided BacNet interface 4.7 Supply and install condensate connections to the nearest suitable drain 4.8 Start-up and testing of the new units Westerly Middle School - 10 Sandy Hill Rd. Westerly, RI 02891 Main IT room - 1 Demo Existing Split System x2 1.1 Reclaim existing units. Catalog Freon per EPA guidelines 1.2 Remove or replacing wiring as needed 1.3 Remove all old piping and insulation. 1.4 Clean up and dispose of all equipment, material, refrigerant and oil properly 2 Install New Split System 2.1 Supply and install two Mitsubishi MUZ-FS12NA-U1 12,000 BTU per hour ductless split condensing units and two Mitsubishi MSZ-FS12NA wall mounted evaporators per manufacturer's instructions 2.2 Provide power wiring to new indoor evaporator and condensing units using existing unit power feeds 2.3 Supply and install new wall mounted wired thermostat controllers. 2.4 Supply install and configure factory provided BacNet interface 2.5 Supply and install condensate connections to the nearest suitable drain 2.6 Start-up and testing of the new units
Sub-Bidding
Educational
$80,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 20, 2024
January 20, 2025
10 Sandy Hill Rd, Westerly, RI
Related To This Project
Westerly, RI
Bid Date: Jan 09 2025
Westerly, RI
--
Westerly, RI
Bid Date: Nov 20 2024
Westerly, RI
Bid Date: Dec 05 2024
Westerly, RI
Bid Date: Nov 07 2024
Westerly, RI
Bid Date: Nov 13 2024
Westerly, RI
Bid Date: Oct 10 2024
Westerly, RI
Bid Date: Sep 19 2024
Westerly, RI
Bid Date: Jun 24 2020
Westerly, RI
Bid Date: Sep 11 2024
Westerly, RI
Bid Date: Oct 03 2024
Westerly, RI
Bid Date: Jul 17 2024
Westerly, RI
Bid Date: Jul 12 2024
Westerly, RI
Bid Date: Jul 08 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.