BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in Montgomery, Alabama. Contact the soliciting agency for additional information.

ADCNR is requesting Statements of Qualifications for the Project to build upon a previous study of the Mobile Bay Causeway and hydrology conducted in 2015. The Project will support the primary RESTORE Comprehensive Plan goal to restore and conserve habitat through a planning effort that: 1) addresses any data gaps remaining from the 2015 study of the Mobile Bay Causeway and hydrology (Weston Solutions Inc. 2015); 2) evaluate the suggested restoration alternatives with a cost-logistics/feasibility frame of reference; and 3) move identified and prioritized restoration alternatives forward to a 30% preliminary engineering design. Questions/Inquiries should be e-mailed to Dr. Rita Peachey (rita.peachey@dcnr.alabama.gov) no later than December 5th at 12:00pm noon (Local Time). Short List Interviews* Week of January 16, 2025 Select Consultant for Contract Negotiations February 7, 2025 (approximately) The State reserves the right to reject any and all proposals and cancel this Request if, in its sole discretion, it deems such action to be in its best interest. For context, the construction of the Mobile Bay Causeway in 1927 resulted in a significant amount of dredge material placement over large portions of the Upper Mobile Bay marsh complex. At the time, filling of marsh was a preferred alternative to elevating the causeway and as a result, restrictions of hydrological interaction and connections between Mobile Bay and its Delta, including faunal migrations and natural food web interactions, have been truncated. Proposed Project activities will inform the restoration of the hydrological exchange necessary for coastal marsh and estuarine wetland habitats in the area to restore ecological integrity and ecosystem health. Project duration is expected to be 2 (two) years. Anticipated Project Budget: Approximately $900,000. The method of Contractor Selection has not been Determined at this time.

Conceptual

Municipal

$900,000.00

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
37
Bidding Soon
446
All Active Projects
174
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2025

img_map_placeholder

Multiple Locations, Montgomery, AL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.