BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 24, 2025 at 8:00 PM

Updated July 25, 2025

Site work for a playground / park / athletic field in Pittsburgh, Pennsylvania. Design plans call for site work for a playground / park / athletic field.

Plans call for parking long improvements create parking lot in rear portion of the site for approximately 40 spaces for park users, tournaments and camp events include lighting. Other plans call for upgrades include paving, color coating, fencing and lighting. ADA Upgrades and Connections Ensure site-wide accessibility and connectivity through pathways or switchbacks, as necessary Include walking path around facilities for multi-generational use with consideration towards future connections to Bedford Dwellings Coal Seam Trail. The athletic field upgrades eliminate one diamond field in order to accommodate additional site amenities, regrade and resurface football field, as needed, to address stormwater management concerns Upgrade amenities such as lighting, dugouts, spectator seating, batting cages and fencing, as needed. The play area improvements relocate and update playground equipment and safety surfacing to integrate with new spray features. Create accessible connections throughout play area, which is proposed to be two-levels, and to other park amenities Design to include 3-5 spray features. The restroom and concession building evaluate existing park building to accommodate public-facing restrooms and concession needs for sports organization. It is anticipated that the building will need minimal improvements. The pavilion and Gathering Space Pavilion to accommodate 4-6 picnic tables and grill Additional green space for passive recreation adjacent to the pavilion. The community garden evaluate the inclusion of Lighting & Safety Improvements Identify needs for proposed lighting per the newly improved park amenities outlined above. The Stormwater Management Stormwater BMP's should be included to meet the City's Stormwater Management Code (see General Responsibilities for more information). As of July 24, 2025, the design firm has been selected. Design has not yet started. A firm timeline for bidding and construction have not been confirmed.

Design

Playgrounds / Parks / Athletic Fields

$100,000.00

Public - City

Site Work

3

5

8

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
118
Bidding Soon
1,758
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2026

Project location map

2217 Bedford Ave, Pittsburgh, PA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.