BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Site work for a water / sewer project in Uniontown, Alabama. Completed plans call for site work for a water / sewer project.

The project includes the following work: Replacement of existing water meters with Ultrasonic water meters. The successful bidder will be required to furnish in satisfactory form, within fifteen (15) days of Notice of Award to Contract: (a) A Performance Bond for one hundred percent (100%) of the total amount of the contract price. (b) A Payment Bond for one hundred percent (100%) of the total amount of the contract price. No Bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The owner reserves the right to waive any informalities or to reject any and all bids. The work to be done under this Contract shall include, but without limitation, the furnishing of all materials, labor, tools, appliances, and equipment necessary to perform and complete everything specified and embodied in the Contract Documents, Plans and Specifications and constructing complete, ready for use, Water Meter Project, all as hereinafter specified and as shown on the plans. The principal items of work are listed in the Advertisement for Blds, and the items of work are listed in detail in the Proposed Form. The specified quantities for unit price bid in the Proposal Form are estimated quantities and are approximate only, and the final quantities may vary from those specified. Such quantities shown, however, at the unit price bid for each shall determine the value of each Proposal. The amount in the column "Total Amount for Item" in the Proposal Form, will be determined by multiplying the number of units shown for each item, by the unit price bid for the item. The sum total of all the amounts will be the Total Amount Bid. The work to be performed by the Contractor shall consist of constructing Water Meter Project.

Award

Water / Sewer

$200,000.00

Public - City

Site Work

77

12

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
17
Bidding Soon
556
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 20, 2024

January 20, 2025

Project location map

Multiple Locations, Uniontown, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.