BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 10, 2025 at 7:00 PM

Updated February 11, 2025

Demolition and site work for a pre-engineered storage facility in Sutton, Massachusetts. Completed plans call for the demolition of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Question Deadline 12/13/2024 at 12:00 PM ET All request for clarification and any questions about information contained in this IFB must be submitted in writing and addressed to: Town Manager 4 Uxbridge Road Sutton MA 01590 Requests may also be submitted by facsimile to the Town Manager at 508-865-8721. Sealed bids under M.G.L. 149 for the demolition of Shaw Barn located at 17 Shaw Lane, Sutton, MA. The scope of the project is for the demolition of the barn at Shaw farm in Sutton MA. The work should commence as soon as possible or within two months. The contractor shall be responsible for the company performing the work. The scope of work consists of demolishing and removing the entire barn structure and collapsing the foundation around the hole. The site shall be graded to remove any hazard. The contractor shall have Workman's Comp Insurance for all personnel on the project. The contractor shall have Liability insurance of a minimum $1,000,000. coverage listing the Town of Sutton as the beneficiary. The contractor shall have all required State licenses for the project The contractor shall supply all materials required for the project. The contractor shall obtain the Building Permit. Prior to the work the contractor shall submit documents to the owner with a work schedule and a plan of how the work will be conducted. The plan shall contain a schedule from start to completion. The contractor shall supply all materials required for the project. The contractor is responsible for any staging, brush removal and any work to perform the demolition of the barn. The contractor is responsible for all required safety equipment. The contractor shall properly dispose of any debris from the site at an approved disposal facility. The contractor shall closeout the building permit

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$24,500.00

Public - City

Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
859
Active Projects
460
Bidding Soon
4,377
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 20, 2025

Project location map

17 Shaw Ln, Sutton, MA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.