BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a stadium in Saint Paul, Minnesota. Completed plans call for the renovation of a stadium.

Ramsey County seeks contractor to remove the existing HVAC system from the roof of Highland Arena to facilitate the installation of a new roof system. Once the new roof installation is complete the contractor will reinstall the HVAC system to ensure continued functionality and optimal performance. CERT Small Business Enterprises are encouraged to respond to this solicitation. Question Deadline Dec 17, 2024 Specifications 1. Condensing Unit Management o Remove and store (2) existing Russell 12-fan air-cooled condensing units at a location on-site as determined by the roofing contractor. o Re-install the units after roofing is completed. Roofing contractor to notify Mechanical contractor. 2. Refrigerant Handling Safely remove and store R-22 refrigerant from the existing units prior to removal, in accordance with the Minnesota Pollution Control Agency (MPCA) requirements. 3. HVAC System Removal o Turn off gas, water, and electricity to the HVAC systems. o Properly collect and store all refrigerant in compliance with environmental and safety regulations. o Cap off all HVAC pipes to prevent damage or contamination during the roof installation process. o Remove all electrical wiring, junction boxes, and associated components. 4. Roof Installation Phase o Collaborate with the roofing contractor to ensure project alignment. o Ensure that the roof installation proceeds without interference from HVAC components. o Verify that all capped pipes and removed components are properly stored and secured during the roof work. 5. HVAC System Reinstallation Reinstall all HVAC systems once the roof installation is complete, including: Moving the HVAC units back onto the new roof (Middle building roof). Reinstalling all electrical wiring and junction boxes. Installing gas lines with unions to facilitate future roof replace, Installing any other necessary components for proper operation of the HVAC systems. Inspecting all components for proper operation. Replacing all unit filters to ensure optimal system performance. Checking refrigerant levels during reinstallation and adding refrigerant if low to ensure proper system operation.

Sub-Bidding

Arenas / Stadiums

$2,000,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
120
Active Projects
81
Bidding Soon
777
All Active Projects
307
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 26, 2024

April 15, 2025

img_map_placeholder

800 Snelling Ave S, Saint Paul, MN


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.