BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a residential development in Wilkes Barre, Pennsylvania. Completed plans call for the renovation of a residential development.

All bids shall be accompanied by a certified check or a Bid Bond made payable to the Wilkes-Barre Housing Authority with corporate surety in an amount of not less than ten (10%) percent of the Bid as a guarantee that the bidder will execute the Contract if awarded the same. The surety Bond, Bid Bond, and the attorney-in-fact that executes the Bond on behalf of the surety shall affix to the Bond a certified and current copy of the Power-of-Attorney. If the bid is not accepted, the Bid will be returned to the Bidder. In the event the Bidder fails, within ten (10) days after Notice of Award, to sign the contract or fails to comply with the bonding or insurance requirements hereinafter stated, the good faith deposit (BID BOND) shall be forfeited to the Housing Authority as Liquidated Damages. Within ten (10) days after the Notice of Award, the successful bidder shall execute the agreement between the owner and the Contractor. Within three (3) days following the date of execution of the Contract, the successful bidder shall deliver the Performance Bond and Payment Bond, each in the amount of 100% of the Contract Sum, and a Certificate of Insurance in the amounts specified. The Bonds shall be included in the Bid. The Bidder shall require the Attorney-In-Fact that executes the required Bonds on behalf of the surety to affix thereto a certified and current copy of the power of Attorney. Attention is called to the provisions for Equal Employment Opportunity and the payment of not less than the minimum salaries and wages set forth in the Contract Documents must be paid on the project. All contractors and subcontractors will be required to adhere to Section 3 of the Housing and Urban Development Act of 1968 as amended. The successful bidder shall pay all required taxes. The agreement shall include a stipulation that Liquidated Damages will be paid in the amount of $200.00 / consecutive calendar day following the deadline date as set forth in the Owner / Contractor Agreement will be paid to the Owner. The Contract Time shall be 300 consecutive calendar days from the Notice to Proceed. If any person contemplating submitting a Bid for the performance of the Work is in doubt as to the true meaning of any part of the Contract Documents, he may submit to the Architect/Engineer a written request for interpretation thereof no later than five (5) days before bids will be opened. The person submitting the request shall be responsible for its prompt delivery. Interpretations or corrections of proposed Contract Documents will be made only by addendum and will be mailed or delivered to each Bidder of Record. The Owner will be responsible for any other explanations or interpretations of the proposed Contract Documents. The successful Bidder shall be required to obtain and pay the costs of all applicable construction licenses and permits and shall submit copies of said permits to the Architect prior to commencing the work. No bid will be considered which fails in any respect to comply with the terms of the Bid Conditions and Contract Documents. Wilkes-Barre Housing Authority reserves the right to accept or reject any or all bids and to waive any informality in the bidding. No bid shall be withdrawn for a period of Ninety (90) days subsequent to the opening of the bids, without consent of the Wilkes-Barre Housing Authority. "Wilkes-Barre Housing Authority is an Equal Opportunity Employer" If any person contemplating submitting a Bid for the performance ofthe Work is in doubt as to the true meaning of any part ofthe Contract Documents, he may submit to the Architect/Engineer a written request for interpretation thereof no later than five (5) days before bids will be opened. The person submitting the request shall be responsible for its prompt delivery. Interpretations or corrections ofproposed Contract Documents will be made only by addendum and will be mailed or delivered to each Bidder ofRecord. The Owner will be responsible for any other explanations or interpretations ofthe proposed Contract Documents. Any prospective bidder desiring an explanation or interpretation of the solicitation, specifications, drawings, etc., must request it at least 7 days before the scheduled time for bid opening. Requests may be oral or written

Post-Bid

Residential Subdivision

$100,000.00

Public - City

Renovation

7

9

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
70
Bidding Soon
1,193
All Active Projects
555
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

January 13, 2025

img_map_placeholder

236 Eastview Dr, Wilkes Barre, PA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.