BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2025 at 7:00 PM

Updated February 14, 2025

Site work for a transportation facility in Eglin, Florida. Completed plans call for site work for a transportation facility.

The estimate project cost is $2.5million to $3million. VPS New A3 Passenger Boarding Bridge The Okaloosa County Board of County Commissioners, hereinafter called "Owner," hereby requests sealed bids for the "VPS New A3 Passenger Boarding Bridge" project, at Destin-Fort Walton Beach Airport. The project can generally be described: Construction of New Passenger Boarding Bridge A3 including new PC Air units, water closets, and associated electrical and architectural improvements. The time of completion for the work is anticipated to be 180 calendar days to achieve Substantial Completion. Exact time requirements are defined in the Instructions to Bidders. The Bid Documents also include a detailed set of Instructions to Bidders. All Bids shall be prepared in accordance with the Instructions to Bidders. The failure to comply with any requirement contained in the Bid Documents may result in the rejection of the Bid as nonresponsive or a finding that the Bidder is not qualified for this Project. A Bid Security in the amount of five percent (5%) of the sum of the Total Bid Price will be required for this Project. Exact Bid Guarantee period requirements are defined in the Instructions to Bidders. All Bidders are hereby notified that they must comply with: 1) the Disadvantaged Business Enterprise (DBE) requirements of 49 CFR Part 26, as referenced in the Owner's Disadvantaged Business Enterprise Participation Program and Affirmative Action requirements; 2) the Buy American requirements imposed by 49 USC 50101; 3) the minimum prevailing wage rates established by the Secretary of the U.S. Department of Labor (Davis Bacon requirements); 4) Certification Regarding Lobbying Pursuant to 49 CFR Part 20 for Contracts, Grants, Loans, and Cooperative Agreements; 5) Certification Regarding Debarment, Suspension, Ineligibility And Voluntary Exclusion (2 CFR Part 1200 and 2 CFR Part 180); and 6) Certification Regarding Foreign Trade Restriction. The Okaloosa County Board of County Commissioners, in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 USC 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises and airport concessions disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The DBE Participation Goal for this Contract is 3.79%. Pre-Bid Meeting: To attend the Zoom meeting, follow the below information to log-in: Join Zoom Meeting https://myokaloosa.zoom.us/j/4587775973pwd=N1g5aXMxVUhxWDRuNktkczJTM2x4dz09&omn=87359127414 Meeting ID: 458 777 5973 Password: 548523 One tap mobile:+19712471195,,4587775973#,,,,*548523# US (Portland) 8887880099,,4587775973#,,,,*548523# US Toll-free Dial by your location: +1 971 247 1195 US (Portland) 888 788 0099 US Toll-free 877 853 5247 US Toll-free Once you have attended the Zoom meeting, please e-mail your company name to epoole@myokaloosa.com to inform the Purchasing Department after your company has attended the Zoom meeting. *Note: this meeting will be recorded for the purpose of producing meeting minutes. Funding for this project is being provided by Okaloosa County, Federal Aviation Administration, and the Florida Department of Transportation and will be subject to all applicable County requirements. Question Deadline 01/03/2025 at 3:00 PM CT All questions about the meaning or intent of these Project Documents are to be directed to the County. Interpretations or clarifications considered necessary by the County in response to such questions will be issued by Addenda online. Questions received after the question deadline may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Final Completion $1,924/day 210 days from NTP

Bid Results

Transportation Terminals

$2,989,000.00

Public - County

Site Work

37

11

14

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
36
Bidding Soon
787
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2025

March 27, 2025

Project location map

1701 FL-85, Eglin, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.