BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2025 at 7:00 PM

Updated February 7, 2025

Remodeling of a municipal facility in Webb, Alabama. Completed plans call for the remodel of a municipal facility.

A cashier's check or bid bond payable to TOWN OF WEBB in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence. of insurance required in the bid documents will be required at the signing of the Contract. Only general contractors who have been approved to bid pursuant to prequalification procedures and criteria established by the Owner will be eligible to bid for the Project. The owner will accept proposals only from firms which demonstrate their experience and ability to perform the work necessary for this Project. Notarized Contractor's Qualification Certificates must be submitted to the Architect along with any request to obtain Bid Documents by a General Contractor. Bids must be submitted on proposal forms furnished by the Architect or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect; the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered . The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. Repair work and remodel of existing interior space. Includes new flooring, ceiling, and wall finishes; new lighting and outlets; new doors and hardware; new cabinetry and fixtures; new drive-thru window and awning; removal of exterior parking items and installation of bollards. Bid #1- Water Department to City Council Chamber Bid #2- Restrooms to Fire Department The work shall include all base bid items plus any of the alternatives agreed upon at the assignment of contract according to the drawings and specifications provided herein. Furnish, fabricate, deliver and erect all light gauge metal framing as shown on the drawings, or herein specified. A. Wind design shall be per ASCE 7-10. See drawings for wind design criteria. B. All bridging and bracing, including erection bracing, required for the finished product shall be designed and furnished. Bracing required for horizontal wind loads shall be designed for loads indicated on the plans and specifications, and as required by applicable codes C. All framing connections shall be designed and furnished. Connections shall be designed for all loading conditions; including uplift and reactions from horizontal wind load transfer. This work shall include all miscellaneous metals and metal fabrication work required to satisfactorily complete the work indicated on the drawings and as specified herein. Items required shall not be assumed to be limited to those listed in these specifications. Definition: Rough carpentry is work not specified as part of other sections and which is generally not exposed, except as otherwise indicated. Types of work in this section include rough carpentry for: Wood grounds, nailers and blocking. The work covered by this section consists of furnishing all labor, materials and equipment required to satisfactorily complete all the sealant, joint fillers, caulking, and related work as indicated on the drawings and as specified herein. The work covered by this Section consists of furnishing and installing all metal doors, frames and related items required to complete the work indicated on the drawings and as specified herein. The work covered by this Section consists of furnishing all labor, materials and equipment required to satisfactorily complete the finish hardware work and related work as indicated on the drawings and as specified herein. The work required under this section consists of all drywall interior finish and related items necessary to complete the work indicated on drawings and described in specifications.

Post-Bid

Municipal

$600,000.00

Public - City

Remodeling

13

15

13

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
42
Bidding Soon
687
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 12, 2024

January 13, 2025

Project location map

315 Webb To Kinsey Rd, Webb, AL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.