BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 21, 2025 at 7:00 PM

Updated February 22, 2025

Site work and new construction of an educational facility in Campbell, California. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

The work of this section consists of furnishing and installing raceways, raceway spacers and encasing material with necessary excavation for underground ducts. B. Encasement - Encasement shall be sand, 2 sack sand slurry or CDF. C. Where required - All raceways, where run underground in an excavation, shall be installed in compliance with the requirements of this Section. Capri ES Ph1 Two Story Classroom Building Inc1 & Inc 2 - Bid Package #3 Mandatory pre-bid conference will include the opportunity to inspect the site and may include dissemination of additional information in response to questions or otherwise, all bidders will be deemed to have notice of all conditions and information which bidders could have obtained by attending the pre-bid conference, including but not limited to any conditions in, at, and about the site, the building or buildings, if any, and any work that may have been done thereon. The Governing Board of the Campbell Union School District reserves the right to accept or reject any or all bids and to act as sole judge of the merit and qualifications of the proposals offered.

Bid Results

Educational

$8,683,474.00

Public - County

New Construction, Site Work

390

35

22

5

Subscribe For Documents

44 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
5
Bidding Soon
1,309
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2025

March 20, 2025

Project location map

850 Chapman Dr, Campbell, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.