BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2025 at 7:00 PM

Updated March 4, 2025

Site work for a sidewalk / parking lot in El Centro, California. Working plans call for site work for a sidewalk / parking lot.

**As of March 03, 2025, project has been canceled. As of this time it is unknown if an when project will rebid. Harding Elementary School (2) Off-site Parking Lots The Work Consists Generally of, but is Not Limited to, Class Ii Base at Parking Lot, Concrete Hardscape, Paving, Striping and New Chain Link Fencing and Gates. Bids Shall Be Received in the Place Identified Above. Each Bid Shall Be Accompanied by a Bid Security in the Form of Cash, a Certified or Cashier's Check or Bid Bond in an Amount Not Less Than Five Percent (5%) of the Total Bid Price, Payable to the District. The District Reserves the Right to Reject Any or All Bids or to Waive Any Irregularities or Informalities in Any Bids or in the Bidding Process. As Required by Section 1773 of the California Labor Code, the California Department of Industrial Relations Has Determined the General Prevailing Rates of Per Diem Wages in the Locality in Which the Work is to Be Performed. The Successful Bidder Upon Award of the Contract Shall Post a Copy of This Document at Each Work Site. It Shall Be Mandatory Upon the Successful Bidder to Whom the Contract is Awarded, and Upon Any Subcontractor Listed, to Pay Not Less Than the Specified Rates to All Workers Employed by Them for the Project. No Contractor or Subcontractor May Be Listed on This Bid Proposal Unless Registered With the Department of Industrial Relations (Dir) Pursuant to Labor Code Section 1725.5. No Contractor or Subcontractor May Be Awarded This Project Unless Registered With the Dir Pursuant to Labor Code Section 1725.5. This Project is Subject to Compliance Monitoring and Enforcement by the Dir. No Bidder May Withdraw Any Bid for a Period of Sixty (60) Calendar Days After the Date Set for the Opening of Bids. Pursuant to Section 22300 of the Public Contract Code, the Agreement Will Contain Provisions Permitting the Successful Bidder to Substitute Securities for Any Monies Withheld by the District to Ensure Performance Under the Agreement or Permitting Payment of Retentions Earned Directly Into Escrow. Document notes Copies of These Wage Rate Determinations, Entitled Prevailing Wage Scale, Are Maintained at: Department of Industrial Relations Division of Labor Statistics and Research 455 Golden Gate Avenue, 8th Floor Po Box 420603 San Francisco Ca 94102-0603 415 703 4774 online and Are Available to Any Interested Party Upon Request. Each General Contractor May Check Out Not More Than Three (3) Sets of Documents; Each Sub-contractor May Check Out One (1) Set. In Accordance With the Provisions of California Business and Professions Code Section 7028.15 and Public Contract Code Section 3300, the District Requires That the Bidder Possess Applicable Classification(S) of Contractor's License(S) at the Time the Bid is Submitted. Any Bidder Not So Licensed at the Time of the Bid Opening Will Be Rejected as Non Responsive. All Work Must Be Completed Within Sixty (60) Calendar Days Specified in the Information for Bidders From the Date Specified in the Notice to Proceed. Time is of the Essence. Failure to Complete the Work Within the Time Set Forth Herein Will Result in the Imposition of Liquidated Damages for Each Day of Delay, in the Amount Set Forth in the Information for Bidders. THE SCOPE OF WORK FOR THIS PROJECT INCLUDES BUT IS NOT LIMITED TO THE FOLLOWING ITEMS: 2) COORDINATION WITH MY PLANS AND SPECIFICATIONS AND IS ACCEPTABLE FOR INCORPORATION INTO THE CONSTRUCTION OF THIS PROJECT. 15. LOCAL ORDINANCES GRADING PLANS, DRAINAGE IMPROVEMENTS, ROAD ACCESS REQUIREMENTS AND AND ENVIRONMENTAL HEALTH CONSIDERATIONS SHALL COMPLY WITH ALL LOCAL ORDINANCES 1. REMOVE EXISTING STRUCTURES AND FOUNDATIONS. 2. REMOVE EXISTING FENCING AND MISCELLANEOUS SITE IMPROVEMENTS. 3. PREPARE NATIVE SOIL AND PROVIDE I2" OF BASE MATERIAL AS DESCRIBED IN DRAWINGS. 4. PROVIDE CONCRETE HARDSCAPE AND PAVING AS DESCRIBED IN DRAWINGS. 5. PROVIDE 3" AC PAVED PARKING LOT. 6. PROVIDE STRIPING. 1. PROVIDE PARKING LOT LIGHTING. 6. PROVIDE CHAIN LINK FENCING AND GATES. 4. PROVIDE GALVANIZED STEEL TUBE FRAMING AND WOOD FENCE AT COMMON PROPERTY LINE. IO. PROVIDE LANDSCAPING. 1. REMOVE EXISTING STRUCTURES AND FOUNDATIONS. 2. REMOVE EXISTING FENCING AND MISCELLANEOUS SITE IMPROVEMENTS. 3. PREPARE NATIVE SOIL AND PROVIDE I2" OF BASE MATERIAL AS DESCRIBED IN DRAWINGS. 4. PROVIDE CONCRETE HARDSCAPE AND PAVING AS DESCRIBED IN DRAWINGS. 5. PROVIDE 3" AC PAVED PARKINg LOT. 6. PROVIDE STRIPING. 1. PROVIDE PARKING LOT LIGHTING. &. PROVIDE CHAIN LINK FENCINg AND GATES. 4. PROVIDE GALVANIZED STEEL TUBE FRAMING AND WOOD FENCE AT COMMON PROPERTY LINE. IO. PROVIDE LANDSCAPING. Questions regarding interpretation of drawings and specifications shall be clarified by the ARCHITECT; provided, however, that in the event ARCHITECT determines that CONTRACTOR'S requests for clarification or interpretation are not justified or do not reflect adequate competent supervision or knowledge by the CONTRACTOR or his/her subcontractors, CONTRACTOR shall be required to pay ARCHITECT'S reasonable and customary fees in processing and responding to such requests. Should the CONTRACTOR commence work or any part thereof without seeking clarification, CONTRACTOR waives any claim for extra work or damages as a result of any ambiguity, conflict or lack of information.

Final Planning

Sidewalks / Parking Lot

$400,000.00

Public - City

Site Work

6

12

4

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
25
Bidding Soon
244
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2025

September 3, 2025

Project location map

950 S 7th St, El Centro, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.