BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 9, 2025 at 7:00 PM

Updated January 10, 2025

Site work, paving and outdoor lighting for a sidewalk / parking lot in Henderson, Nevada. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project involves the installation of landscaping, irrigation, trail amenities, and trail lighting along Pueblo Boulevard between Boulder Highway and Apache Place in the City of Henderson, Nevada. Question Cut Off Date 12/11/2024 05:00:00 PM (PT) All questions regarding this IFB must be submitted electronically through the NGEM system using the Questions Tab The construction to be performed under this Contract will be situated in the City of Henderson, Nevada, where shown on the drawings. This work shall include approximately the following: This project involves the installation of landscaping, irrigation, trail amenities, and trail lighting along Pueblo Boulevard between Boulder Highway and Apache Place in the City of Henderson, Nevada. The work to be performed under this Contract shall consist of the following: o Furnishing all plant, tools, equipment, materials, supplies, and manufactured articles; o Furnishing all labor, transportation, and services, including fuel, power, water, and essential communications; and o Furnishing all work or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. By submitting a bid for this project, the CONTRACTOR hereby acknowledges and assures the CITY that it has substantial experience in constructing this type of work and therefore is familiar with all combinations of materials, labor and equipment that are required for the successful completion of this project. The Contract shall be complete, and all work, materials, and services not expressly indicated or called for in the Contract Documents shall be provided by the CONTRACTOR at no increase in cost to the CITY. The CONTRACTOR shall maintain complete control over its employees and all of its Subcontractors. Nothing contained in this Contract or any subcontract awarded by the CONTRACTOR shall create any contractual relationship between any such Subcontractor and the CITY. The CONTRACTOR shall perform all work in accordance with its own methods subject to compliance with the Contract. The CONTRACTOR shall supervise, inspect and direct the work competently and efficiently, devoting such attention and applying such skills and expertise as may be necessary to perform the work in a safe manner and in accordance with the Contract Documents. The CONTRACTOR shall be solely responsible for the means, methods, techniques, sequences and procedures of construction, and shall be responsible to see that the completed work complies accurately with the Contract Documents.

Bid Results

Sidewalks / Parking Lot

$888,024.00

Public - City

Outdoor Lighting, Paving, Site Work

37

28

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
29
Bidding Soon
320
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

February 3, 2025

Project location map

N Pueblo Blvd, Henderson, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.