BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2025 at 8:00 PM

Updated July 1, 2025

Site work and paving for a water / sewer project in Wheeling, Illinois. Completed plans call for site work for a water / sewer project; and for paving for a water / sewer project.

As of June 30, 2025, project is under construction. The Village of Wheeling invites you to bid on an anticipated contract for DUNDEE ROAD WATER MAIN IMPROVEMENTS (hereinafter referred to as the "Project"). The Project can generally be described as the replacement of approximately 3,600 lineal feet of 12-inch PVC water main, approximately 170 feet of 10-inch water main, 500 lineal feet of 8-inch water main, valve vaults, hydrants, and other associated work. Extensive traffic control will be required. All roadways, driveways, and sidewalks shall be patched or repaired in accordance with the plans.) The scope of the Project shall include all equipment, materials, labor, training, warranties and construction and/or installation services necessary to implement the contemplated construction. The Village of Wheeling reserves the right to waive any irregularities, technicalities, informalities, and other nonmaterial variances contain in any Bid Proposal and to reject all Bids. The Village reserves the right to hold any received Bid Proposal for a period of ninety (90) days from the opening date set forth above. BID SECURITY: Yes, 10% of Bid CONTRACT SECURITY: The successful Bidder will be required to provide performance and payment bonds covering the full amount of the Contract Price or Contract Sum securing full and faithful performance of the Contract and the payment for all labor material furnished by the Bidder or anyone furnishing such under the Bidder's contract or a subcontract of any tier. The successful Bidder will also be required to comply with the requirements under Illinois and federal law applicable to a public works project, including the Illinois Prevailing Wage Act.

Under Construction

Water / Sewer

$3,716,293.00

Public - City

Paving, Site Work

65

9

2

6

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
515
Active Projects
287
Bidding Soon
3,683
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 9, 2025

March 15, 2025

Project location map

Dundee Rd, Wheeling, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.