BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Toronto, Ontario. Completed plans call for site work for a water / sewer project.

The Shoreside Infrastructure Project at the JLFT involves the delivery of civil, structural and electrical works to support the operation of electric ferry vessels starting in 2026 (Project). A general description of the four components of the Project are as follows: - Foundation systems for three Electric Houses (E-Houses) supplied by the Client's electrical system integrator (Electrical System Integrator). - Underground ducts running from the street to the E-Houses, and from there to four JLFT docks. These underground ducts will carry the electrical wiring originating from Toronto Hydro on Queens Quay West and will terminate at the Automatic Shore Charging Systems (ASCS, also known as charging towers). - Upgrading of the four docks to accommodate new fenders, new mooring bollards and a new concrete pad on which to place the ASCS supplied by the Electrical System Integrator (As a part of the Project only two of the docks will be equipped with an ASCS, while the remaining two will have all enabling works completed for the future installation of ASCS). - Dismantling of the existing dolphin structure(s) to implement a new arrangement of six dolphins on independent piles, on which a rotating fender system and mooring bollards will be installed. This new arrangement of dolphins, including two gangways, will be used to guide vessels approaching the docks, to limit vessel movement during charging and loading operations, and to moor vessels. The scope of Work and requirements for the Project are further described in Section 2 and elsewhere in this RFP. Time is of the essence for completion of the Project. The Project must be completed in October 2026 in advance of the arrival of the RoPax vessel (vessel that carries passenger and vehicles) in Q4 2026, in order to provide time for commissioning, trials and operations. A bid bond in the amount of $500,000 ("Bid Bond"). A surety company's consent to bond for 50% Performance and 50% Labour and Materials. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline: 2025/01/15 12:00:00 PM EST

GC Bidding

Water / Sewer

$5,000,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
111
Bidding Soon
2,519
All Active Projects
978
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 7, 2025

March 10, 2025

img_map_placeholder

11 Queens Quay W, Toronto, ON

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.