BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 21, 2025 at 7:00 PM

Updated January 22, 2025

Demolition, remodeling and renovation of an educational facility in Hollywood, South Carolina. Completed plans call for the remodel of a educational facility; for the demolition of a educational facility; and for the renovation of a educational facility.

Scope of work includes but is not limited to: The Scope for Phase 1 is demolition and renovation of the existing field house. Work includes but not limited to the interior wall and slab removal with associated items and adjusting openings. Install new walls, power, IT, controls and fire alarm with adjustments to HVAC system and the plumbing installation. It includes floor wall and ceiling finishes and equipment as per plans. The Scope for Phase 2 is broken into sections. Area 1 is the field house addition and hardscape. Area 2 is the replacement and installation of the new Pressbox along with required hardscape. Area 3 is the ticket canopy and new entry gate. Items include, power, masonry, finishes as per plans. There will be at least two addenda. The first confirms the Prebid and question date changes. Addendum two will include these meeting minutes along with any questions generated. All questions are due by 12/10/24 at noon so there will be adequate time to generate and issue an Addendum If additional visits are required by contractors, a time needs to be established for site visits. Everyone is to email Cumming back with the date they wish to visit. Visits can take place at any point. If anyone wants to wait until after school hours; school dismisses at 2:25pm. Cumming will inform the school ofsite visits, and everyone needs to check in at the office before reviewing the area. The following scope of work (and/or special conditions) is considered a part of the bid requirements for this project. All terms and conditions as outlined in the project plans, specifications and amendments shall apply. Question Deadline 12/13/2024 change from 12/10/2024 All contact should be directed to Raymond Jenkins, Procurement Services Supervisor. No company should contact District staff directly. All questions should be submitted to Raymond Jenkins prior to the deadline for receipt of questions via Email Raymond_jenkins@charleston.k12.sc.us with copy to Forrest L. King fking@cumming-group.com. Answers to any questions submitted will be sent to all companies via solicitation amendment.

Award

Educational

$3,135,380.00

Public - County

Demolition, Remodeling, Renovation

98

28

2

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
52
Bidding Soon
714
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 19, 2024

January 3, 2025

Project location map

5117 Baptist Hill Rd, Hollywood, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.