Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 25, 2025 at 7:00 PM
Updated February 26, 2025
Site work and paving for a civil project in Denver, Colorado. Working plans call for site work for a road / highway; and for paving for a road / highway.
The owner has selected a Construction manager. A timeline for construction has not yet awarded. Reference Number 0000369925 Bid Intent Not Available Denver's Department of Transportation & Infrastructure (DOTI) is seeking a Construction Manager/General Contractor to provide services for the renovation of the existing asphalt plant, including but not limited to new equipment, revised layouts for improved traffic routing, utilities, and material storage, while maintaining existing seasonal operations of the asphalt plant. Preconstruction Notice to Proceed ("NTP") Q2 2025 Prequalification Requirements Each contractor must be prequalified in category 2A General Building - Unoccupied Building at or above the $6,000,000.00 monetary level in accordance with the City's Rules and Regulations Governing Prequalification of Contractors. Each contractor must have submitted a prequalification application a minimum of ten (10) calendar days prior to the Phase 1 Proposal due date. Applications must be submitted via online. To view the Rules and information on how to apply, please visit our website at online. Question Deadline 12/19/2024 at 2:00 PM MT Questions are submitted online No Denver's Department of Transportation & Infrastructure (DOTI) is seeking a Construction Manager/General Contractor to provide services for the Roslyn Asphalt Plant Renovation Project at 5440 Roslyn Street, Denver, CO 80216. The goal of the project is to renovate the existing asphalt plant, including but not limited to new equipment, revised layout for improved traffic routing, utilities, and materials storage, while maintaining existing seasonal operations of the asphalt plant. The City wishes to improve the existing Asphalt Plant, decrease emissions, improve traffic routing, increase production of asphalt, and engage in staffing increases producing more jobs. In order to achieve this, this project will renovate the site and equipment at the Roslyn Complex. The renovation will address existing traffic routing, failing equipment, and material storage, that are beyond their useful life. The project will be phased to procure long lead equipment early with the bulk of construction during the winter of 2025, 2026. The project has an anticipated construction budget of $4,200,000.00. The participation requirement for this project are: Preconstruction Phase: No Program Construction Phase: 5% Minority and Women-Owned Business Enterprise (MWBE) Buyer Preferences, Guidelines & Requirements Participation Requirements - Minority Business Participation - Women-Owned Business Participation General Requirements - Bidder Prequalification/Preregistration Required - Insurance Required As the City's best interests may appear, the Executive Director of Transportation & Infrastructure (DOTI) reserves the right to waive informalities in, and to reject any or all, proposals.
Pre-Construction/Negotiated
Roads / Highways
$4,200,000.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
17
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 9, 2025
October 1, 2025
5440 Roslyn St, Denver, CO
Related To This Project
Denver, CO
Bid Date: Jan 09 2025
Denver, CO
Bid Date: Jan 07 2025
Denver, CO
Bid Date: Jan 02 2025
Denver, CO
Bid Date: Dec 17 2024
Denver, CO
Bid Date: Dec 09 2024
Denver, CO
Bid Date: Jan 06 2025
Denver, CO
Bid Date: Jan 09 2025
Denver, CO
--
Denver, CO
Bid Date: Jan 14 2025
Denver, CO
Bid Date: Dec 27 2024
Denver, CO
Bid Date: Jan 10 2025
Denver, CO
Bid Date: Jan 09 2025
Denver, CO
Bid Date: Jan 16 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
