Published January 14, 2025 at 7:00 PM

Updated January 15, 2025

Site work, paving and outdoor lighting for a mixed-use development in Shorewood, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

provision of all labor, equipment, and materials necessary for the following work: Street Lighting Replacement: Phase 1 (Plans Prepared by KL Engineering) 1. Replacement of approximately 222 luminaires and 120 light poles. 2. Installation of approximately 49,000 feet of HDPE conduit, and 1,100 feet of flexible conduit 3. Installation of 156,000 feet of #6 AWG conductors, 13,300 feet of #12 AWG conductors 4. Installation of approximately 324 Quazite pull boxes 5. Installation of approximately 660 submersible splice blocks 6. Landscape restoration of 1,300 square yards in terraces using sod and topsoil depending on area size, and potential for some concrete sidewalk and asphalt pavement 7. Installation of 1 240/480V lighting control cabinet, meter pedestal, and concrete base The letting of work is subject to the provisions of Section 66.0901 of the Wisconsin Statutes. Bids shall be accompanied by a bid bond or certified check payable to the Village of Shorewood equal to 5% of the largest possible total bid. The successful bidder's failure to execute the contract and furnish the performance bond within 10 days after the award shall cause the bid bond or check to be forfeited to the Village as liquidated damages in accordance with Section 62.15(3) of the Wisconsin Statutes. The Village of Shorewood reserves the right to accept any bid most advantageous to the Village, waive any technicality, or reject any or all bids. No bid shall be withdrawn for a period of sixty (60) days after the bid opening date without the consent of the Village. Contractors MUST be PreQualified prior to placing a bid in accordance with Section 00 45 13. Est. Completion Date: Oct. 31, 2025 Pre-Qualification: Yes

Award

Roads / Highways

$1,693,772.00

Public - City

Outdoor Lighting, Paving, Site Work

118

12

10

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
412
Active Projects
240
Bidding Soon
1,996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 18, 2024

February 16, 2025

Project location map

Multiple Locations, Shorewood, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.