BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 31, 2025 at 7:00 PM

Updated February 1, 2025

Renovation of a conference / convention center in Las Vegas, Nevada. Completed plans call for the renovation of a conference / convention center.

**As of January 31,2025, project was awarded to Muller Construction, awarded amount is $147,371.40.* Provide all necessary labor, equipment, and materials to replace the South Hall East entrance doors at the Las Vegas Convention Center, located at 3150 Paradise Road, Las Vegas, NV. Additionally, install card readers to enhance access control at the specified entrance. The contractor shall provide all labor, equipment, and materials necessary to replace the South Hall East entrance doors and install card readers. The project includes demolition, installation, and coordination of access control systems, ensuring compliance with all applicable codes and standards. Question Deadline 12/30/2024 at 3:00 PM PT Participation in a mandatory pre-bid job walk is required. In order for Contractor to be able to arbitrate any claim, dispute or other matter in question between the parties, written notice of its intention to arbitrate such claim, dispute or other matter must be given to Authority, with three (3) copies thereof to the Nevada Arbitration Association or American Arbitration Association as selected by Authority within six (6) calendar months after the claim, dispute or other matter arises. Scope Includes but is Not Limited To: 1. Site Preparation & Demolition: Clean and prepare thresholds. Cut out and repour thresholds (minimum 12 inches wide, 3 inches deep) for new door installation. Dispose of all job debris offsite, adhering to local, state, and federal regulations. Manage hazardous material protocols if encountered. 2. Door Installation: Furnish and install door pairs and hardware per drawings, matching the existing vestibule doors. 3. Access Control: Provide conduits from door frames to service boxes for strike power, request-toexit (REX), card readers, and door position sensors (DPS). Install required cabling from the access control cabinet in TRS1D to the doors for REX, DPS, and crash bar power. Install (2) HID card readers, door contacts, and crash bar hardware.

Award

Conference / Convention Centers

$147,371.00

Public - City

Renovation

6

3

3

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
24
Bidding Soon
343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 6, 2025

February 5, 2025

Project location map

3150 Paradise Rd, Las Vegas, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.