BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Ely, Nevada. Working plans call for site work for a development; and municipal facility.

The intent of this project is to remove and replace approximately 13.1 miles of existing barbwire fence lines near Ellison Meadows on the Ely Ranger District, Humboldt- Toiyabe National Foest. B. This project includes the removal of approximately 69,064 feet of existing barbwire fence as a lump sum. Approximately 69,064 feet of new barbwire fence are to be installed including an estimated fifteen 12-foot wire gates. All brace and anchor posts are to be schedule-40, galvanized steel except for wood posts located at the wire gates. Clearing of vegetation is allowed as needed to ensure a straight fence, however heavy equipment will not be allowed to clear the fence lines. Chainsaws are allowed for vegetation clearing. Fence runs should not deviate more than 12-inches from a straight line between braces. C. The Schedule A work includes removing and replacing barbwire fences in locations A, B, and C. D. The Option A work includes removing and replacing barbwire fences in locations D, E, F, G, H, I and J. E. Work shall be performed in accordance with specifications and drawings in the plan sheets, followed by the 'Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14).' Magnitude of the Proposed Project: In accordance with FAR 36.204, the estimated magnitude of construction for this project is between $250,000 and $500,000. Solicitation Date: The solicitation is anticipated to be issued on or after December 19th, 2024. Contract Time/Period of Performance: The anticipated start date is May 1st, 2025. A. Base Bid: 45 Calendar Days from Notice To Proceed. B. Option A: Adds an additional 45 Calendar Days. The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Conservation and Development

$500,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
9
All Active Projects
1
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

img_map_placeholder

To Be Determined, Ely, NV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.