Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 4, 2025 at 7:00 PM
Updated February 5, 2025
Site work, paving and new construction of a mixed-use development in Orland, California. Completed plans call for the construction of a educational facility; for site work for a educational facility; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
This project in general shall consist of but is not limited to, 1) providing necessary site work and new concrete foundations for one (1) 36'-0" x 40'-0" Administrative Office existing modular building and two (2) 24'-0" x 40'-0" open interior design Classroom existing modular buildings, each to be disassembled from their present location on the Main Campus, and relocated and re-installed on the Glenn Center under this contract. Other Work includes, providing 1) concrete site work to include site grading and installation of curbing, gutters, sidewalks; 2) new underground utilities for storm, water, electric and fiber/fire/analog wiring and cabling at new site;3) installation of building fire alarm and data/communication systems pathways; 4) alteration of 36'-0" x 40'-0" Classroom modular on site as required to construct seven (7) new offices, one (1) conference room and one (1) custodial closet; 5) alteration of one (1) 24'-0" x 40'-0" Classroom modular on site as required to provide new classroom; 6) erosion control and general conditions in accordance with the Project design Specifications, Drawings; and 7) notifying the EPA (United States Environmental Protection Agency) prior to relocation of the modulars in accordance with other related documents and Mandatory Job-Walk and Pre-Bid Meeting. The start date for the project February 3, 2025 and the scheduled completion date is June 13, 2025. The District has established an estimated project budget of $931,775.00 for completing the "turnkey" construction of the Project. PRE-BID INQUIRIES Latest date/time for Bidders submittal of Pre-Bid Inquiries 4:00 PM, Wednesday, January 08, 2025. Latest date/time for District responses to Pre-Bid Inquiries 4:00 PM, Friday, January 10, 2025.
Award
Educational
$1,017,000.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 14, 2025
February 18, 2025
1366 Cortina Dr, Orland, CA
Related To This Project
Orland, CA
Bid Date: Apr 29 2025
Orland, CA
Bid Date: Sep 12 2025
Orland, CA
Bid Date: Sep 12 2025
Orland, CA
Bid Date: Sep 12 2025
Orland, CA
Bid Date: Sep 12 2025
Orland, CA
Bid Date: Sep 12 2025
Orland, CA
Bid Date: Nov 13 2024
Orland, CA
Bid Date: Aug 08 2024
Orland, CA
Bid Date: May 02 2024
Orland, CA
Bid Date: Feb 21 2024
Orland, CA
Bid Date: Jan 04 2024
Orland, CA
Bid Date: Sep 12 2023
Orland, CA
Bid Date: Sep 07 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
