BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Pittsburgh, Pennsylvania. Completed plans call for site work for a water / sewer project.

The scope of work generally includes construction to rehabilitate the Aspinwall Pump Station, construction of the Clearwell Bypass, and construction of the new Bruecken Pump Station and all phases of process-mechanical, structural, architectural, civil and site work, site piping, and all associated work not specifically assigned to another contract. The rehabilitation of the Aspinwall Pump Station includes, but is not limited to, installing four new horizonal split case pumps in generally the same location as the existing pumps, demolition of the existing fluoride building, garage, and orthophosphate system, construction of the new chemical building which would house the new orthophosphate and fluoride treatment system, stormwater system improvements with its associated yard piping system, and all associated piping and appurtenances associated with the work to rehab the Aspinwall Pump Station. The pumps would be replaced sequentially to maximize the station's available capacity during construction. The demolition of the existing orthophosphate and fluoride system will be executed in such a sequence without any outage of the chemicals injection to the filtered water. The improvement work of the Aspinwall Pump Station also includes converting the trade shop area to two-story open office space. The construction of the new Clearwell Bypass includes, but is not limited to, construction of a 144- inch bypass and an 84-inch bypass along the south embankment of the existing Clearwell, construction of an overflow structure and three bypass vaults, construction of connections to the existing inlet and outlet gatehouse, and all ancillary work associated with the construction of the Clearwell Bypass The construction of the new Bruecken Pump Station includes, but is not limited to, demolition of the existing garage, construction of the new three-story pump station which would house six new vertical turbine pumping units with an integral wet well, construction of new orthophosphate building, construction of large diameter piping, valves, vaults, and all ancillary work associated with the construction of the new pump station

GC Bidding

Water / Sewer

$280,000.00

Public - County

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
48
Bidding Soon
805
All Active Projects
350
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2025

March 14, 2025

img_map_placeholder

Multiple Locations, Pittsburgh, PA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.