BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Trenton, New Jersey. Completed plans call for site work for a road / highway; and sidewalk / parking lot.

Guiderail Replacement Central, Contract 2019-2, Contract No. 001223210, Guide Rail Replacement, City of Trenton and Township of Lawrence, Mercer County; Federal Project No: 0001(359), UPC No: 223210, PE No: 2207279, CE No: 1101526 Estimated Completion Date on 04/27/2026 DBE Goals for this Project 11% Estimated Range between $2,500,001 to $5,000,000 Contractors Prequalified in one of these Work Types are eligible to bid this project: 7, 15, or 5 The Principal Items of Work Consist of: Roadway Quantity Unit Description 273,381 Lf Traffic Stripes, Latex, 4" 2,600 Lf Construction Barrier Curb 1,720 Lf Construction Barrier/vertical Curb 10,120 Lf Sawcut Vertical Curb 17,070 Lf Beam Guide Rail Pursuant to N.J.S.A. 34:11-56.35(d), if the Commissioner of the Department of Labor and Workforce Development (LWD Commissioner) makes an initial determination that an employer has violated the provisions of P.L.1963, c.150 (C.34:11-56.25 et seq.) by paying wages at rates less than the rates applicable under that act, the LWD Commissioner may immediately issue a stop-work order to cease all business operations at every site where the violation has occurred, and may assess a civil penalty of $5,000 per day against the employer for each day it conducts business operations in violation of the stop-work order. If the stop-work order is issued against a subcontractor, the general contractor may terminate that subcontractor from the project in accordance with N.J.S.A. 34:11-56.35(d). Minimum wage rates for this project shall be as specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on file with this Department. The attention of bidders is directed to the provisions covering subletting or assigning the contract to Section 108-Prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The entire work is to be completed on or before the Estimated Completion Date Stated Above DOT reserves its right to reject any or all bids in accordance with N.J.S.A. 27:7-30 and N.J.S.A. 27:7-33. NJDOT: 152 - Guiderail Replacement Central, Contract 2019-2 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

Roads / Highways

$5,000,000.00

Public - State/Provincial

Site Work

180

3

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
157
Bidding Soon
4,138
All Active Projects
1,826
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 31, 2024

March 3, 2025

img_map_placeholder

Multiple Locations, Trenton, NJ

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.